• Facebook
  • Twitter
x

MARK KERRISON | Photojournalist

  • Live News Feed
  • Slideshows
  • About
    • About
    • Data Protection
    • Terms and Conditions
  • Contact
Show Navigation
Cart Lightbox Client Area

Search Results

Refine Search
Match all words
Match any word
Prints
Personal Use
Royalty-Free
Rights-Managed
(leave unchecked to
search all images)
Next
{ 2798 images found }
twitterlinkedinfacebook

Loading ()...

  • West Hyde, UK. 9th July, 2021. The South Portal site for the Chiltern tunnel section of the HS2 high-speed rail link. HS2 Ltd has announced the launch of the second 2,000-tonne tunnel boring machine (TBM), named Cecilia after astronomer and astrophysicist Cecilia Payne-Gaposchkin, to excavate a second 10-mile tunnel beneath the Chilterns.
    HS2-South-Portal-West-Hyde-007.jpg
  • An excavator moves the remnants of felled trees in front of precision-engineered tunnel segments at the South Portal site for the Chiltern tunnel section of the HS2 high-speed rail link on 9th July 2021 in West Hyde, United Kingdom. HS2 Ltd has announced the launch of the second 2,000-tonne tunnel boring machine (TBM), named Cecilia after astronomer and astrophysicist Cecilia Payne-Gaposchkin, to excavate a second 10-mile tunnel beneath the Chilterns.
    HS2-South-Portal-West-Hyde-005.jpg
  • West Hyde, UK. 9th July, 2021. The South Portal site for the Chiltern tunnel section of the HS2 high-speed rail link. HS2 Ltd has announced the launch of the second 2,000-tonne tunnel boring machine (TBM), named Cecilia after astronomer and astrophysicist Cecilia Payne-Gaposchkin, to excavate a second 10-mile tunnel beneath the Chilterns.
    HS2-South-Portal-West-Hyde-014.jpg
  • West Hyde, UK. 9th July, 2021. The remnants of felled trees are pictured at the South Portal site for the Chiltern tunnel section of the HS2 high-speed rail link. HS2 Ltd has announced the launch of the second 2,000-tonne tunnel boring machine (TBM), named Cecilia after astronomer and astrophysicist Cecilia Payne-Gaposchkin, to excavate a second 10-mile tunnel beneath the Chilterns.
    HS2-South-Portal-West-Hyde-010.jpg
  • The South Portal site for the Chiltern tunnel section of the HS2 high-speed rail link is pictured on 9th July 2021 in West Hyde, United Kingdom. HS2 Ltd has announced the launch of the second 2,000-tonne tunnel boring machine (TBM), named Cecilia after astronomer and astrophysicist Cecilia Payne-Gaposchkin, to excavate a second 10-mile tunnel beneath the Chilterns.
    HS2-South-Portal-West-Hyde-002.jpg
  • West Hyde, UK. 9th July, 2021. The South Portal site for the Chiltern tunnel section of the HS2 high-speed rail link. HS2 Ltd has announced the launch of the second 2,000-tonne tunnel boring machine (TBM), named Cecilia after astronomer and astrophysicist Cecilia Payne-Gaposchkin, to excavate a second 10-mile tunnel beneath the Chilterns.
    HS2-South-Portal-West-Hyde-012.jpg
  • An excavator moves the remnants of felled trees in front of precision-engineered tunnel segments at the South Portal site for the Chiltern tunnel section of the HS2 high-speed rail link on 9th July 2021 in West Hyde, United Kingdom. HS2 Ltd has announced the launch of the second 2,000-tonne tunnel boring machine (TBM), named Cecilia after astronomer and astrophysicist Cecilia Payne-Gaposchkin, to excavate a second 10-mile tunnel beneath the Chilterns.
    HS2-South-Portal-West-Hyde-001.jpg
  • Precision-engineered, fibre-reinforced tunnel segments are pictured at the South Portal site for the Chiltern tunnel section of the HS2 high-speed rail link on 9th July 2021 in West Hyde, United Kingdom. HS2 Ltd has announced the launch of the second 2,000-tonne tunnel boring machine (TBM), named Cecilia after astronomer and astrophysicist Cecilia Payne-Gaposchkin, to excavate a second 10-mile tunnel beneath the Chilterns.
    HS2-South-Portal-West-Hyde-003.jpg
  • Preparatory works for the Chiltern Tunnel section of the HS2 high-speed rail link are pictured on 16th February 2022 in West Hyde, United Kingdom. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    HS2-works-West-Hyde-Colne-Valley-018.jpg
  • West Hyde, UK. 9th July, 2021. The remnants of felled trees are pictured at the South Portal site for the Chiltern tunnel section of the HS2 high-speed rail link. HS2 Ltd has announced the launch of the second 2,000-tonne tunnel boring machine (TBM), named Cecilia after astronomer and astrophysicist Cecilia Payne-Gaposchkin, to excavate a second 10-mile tunnel beneath the Chilterns.
    HS2-South-Portal-West-Hyde-013.jpg
  • West Hyde, UK. 16th February, 2022. Preparatory works for the Chiltern Tunnel section of the HS2 high-speed rail link. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    HS2-works-West-Hyde-Colne-Valley-008.jpg
  • West Hyde, UK. 16th February, 2022. Preparatory works for the Chiltern Tunnel section of the HS2 high-speed rail link. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    HS2-works-West-Hyde-Colne-Valley-012.jpg
  • West Hyde, UK. 9th July, 2021. An excavator moves the remnants of felled trees in front of precision-engineered tunnel segments at the South Portal site for the Chiltern tunnel section of the HS2 high-speed rail link. HS2 Ltd has announced the launch of the second 2,000-tonne tunnel boring machine (TBM), named Cecilia after astronomer and astrophysicist Cecilia Payne-Gaposchkin, to excavate a second 10-mile tunnel beneath the Chilterns.
    HS2-South-Portal-West-Hyde-015.jpg
  • West Hyde, UK. 9th July, 2021. Saplings planted by way of environmental mitigation close to the South Portal site for the Chiltern tunnel section of the HS2 high-speed rail link. HS2 Ltd has announced the launch of the second 2,000-tonne tunnel boring machine (TBM) at the site, named Cecilia after astronomer and astrophysicist Cecilia Payne-Gaposchkin, to excavate a second 10-mile tunnel beneath the Chilterns.
    HS2-South-Portal-West-Hyde-009.jpg
  • An excavator moves the remnants of felled trees in front of precision-engineered tunnel segments at the South Portal site for the Chiltern tunnel section of the HS2 high-speed rail link on 9th July 2021 in West Hyde, United Kingdom. HS2 Ltd has announced the launch of the second 2,000-tonne tunnel boring machine (TBM), named Cecilia after astronomer and astrophysicist Cecilia Payne-Gaposchkin, to excavate a second 10-mile tunnel beneath the Chilterns.
    HS2-South-Portal-West-Hyde-008.jpg
  • West Hyde, UK. 16th February, 2022. Preparatory works for the Chiltern Tunnel section of the HS2 high-speed rail link. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    HS2-works-West-Hyde-Colne-Valley-002.jpg
  • West Hyde, UK. 9th July, 2021. An excavator moves the remnants of felled trees in front of precision-engineered tunnel segments at the South Portal site for the Chiltern tunnel section of the HS2 high-speed rail link. HS2 Ltd has announced the launch of the second 2,000-tonne tunnel boring machine (TBM), named Cecilia after astronomer and astrophysicist Cecilia Payne-Gaposchkin, to excavate a second 10-mile tunnel beneath the Chilterns.
    HS2-South-Portal-West-Hyde-006.jpg
  • An excavator moves the remnants of felled trees in front of precision-engineered tunnel segments at the South Portal site for the Chiltern tunnel section of the HS2 high-speed rail link on 9th July 2021 in West Hyde, United Kingdom. HS2 Ltd has announced the launch of the second 2,000-tonne tunnel boring machine (TBM), named Cecilia after astronomer and astrophysicist Cecilia Payne-Gaposchkin, to excavate a second 10-mile tunnel beneath the Chilterns.
    HS2-South-Portal-West-Hyde-004.jpg
  • Wendover, UK. 9th February, 2022. Preparatory works in Rocky Lane for the HS2 high-speed rail link. Pictured is an access point to a haul road towards Leather Lane to the south. An underbridge passing under the HS2 route will also be constructed for Rocky Lane.
    HS2-rail-works-Wendover-074.jpg
  • Wendover, UK. 9th February, 2022. Preparatory works for the Small Dean viaduct section of the HS2 high-speed rail link are pictured alongside the A413.
    HS2-rail-works-Wendover-052.jpg
  • West Hyde, UK. 16th February, 2022. Preparatory works for the Chiltern Tunnel section of the HS2 high-speed rail link. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    HS2-works-West-Hyde-Colne-Valley-015.jpg
  • A Stop HS2 banner is pictured outside Harefield Marina on 16th February 2022 in Harefield, United Kingdom. The route for the HS2 high-speed rail link will cross waterways and lakes in the Colne Valley Regional Park by means of the Colne Valley Viaduct which will become the UK's longest railway bridge.
    HS2-works-Harefield-Colne-Valley-010.jpg
  • Harefield, UK. 5th February, 2022. Security guards monitor a gate to a construction site for the HS2 high-speed rail link in the Colne Valley. A viaduct requiring 292 piles driven into the aquifer, a natural water filtration system, is currently being constructed to carry HS2 across lakes and watercourses in the Colne Valley Regional Park.
    HS2-Colne-Valley-Viaduct-site-013.jpg
  • Ickenham, UK. 5th February, 2022. A view of works for the HS2 high-speed rail link close to the Chiltern Railway in the Colne Valley. A viaduct requiring 292 piles driven into the aquifer, a natural water filtration system, is currently being constructed to carry HS2 across lakes and watercourses in the Colne Valley Regional Park.
    HS2-Colne-Valley-Viaduct-site-010.jpg
  • West Hyde, UK. 9th July, 2021. An excavator moves the remnants of felled trees in front of precision-engineered tunnel segments at the South Portal site for the Chiltern tunnel section of the HS2 high-speed rail link. HS2 Ltd has announced the launch of the second 2,000-tonne tunnel boring machine (TBM), named Cecilia after astronomer and astrophysicist Cecilia Payne-Gaposchkin, to excavate a second 10-mile tunnel beneath the Chilterns.
    HS2-South-Portal-West-Hyde-011.jpg
  • Great Missenden, UK. 9th February, 2022. A 30-tonne Volvo articulated hauler truck used to transport soil as part of preparations for the HS2 high-speed rail line crosses Leather Lane. Several hundred-year-old oak trees have been felled for the infrastructure project along the wildlife-rich ancient country lane which provided refuge to at least seven species of bat including the endangered Barbastelle.
    HS2-rail-works-Wendover-043.jpg
  • Great Missenden, UK. 9th February, 2022. A 30-tonne Volvo articulated hauler truck used to transport soil as part of preparations for the HS2 high-speed rail line crosses Leather Lane. Several hundred-year-old oak trees have been felled for the infrastructure project along the wildlife-rich ancient country lane which provided refuge to at least seven species of bat including the endangered Barbastelle.
    HS2-rail-works-Wendover-054.jpg
  • Great Missenden, UK. 9th February, 2022. A 30-tonne Volvo articulated hauler truck used to transport soil as part of preparations for the HS2 high-speed rail line crosses Leather Lane. Several hundred-year-old oak trees have been felled for the infrastructure project along the wildlife-rich ancient country lane which provided refuge to at least seven species of bat including the endangered Barbastelle.
    HS2-rail-works-Wendover-050.jpg
  • 30-tonne Volvo articulated hauler trucks used to transport soil as part of preparations for the HS2 high-speed rail line cross Leather Lane on 9th February 2022 in Great Missenden, United Kingdom. Several hundred-year-old oak trees have been felled for the infrastructure project along the wildlife-rich ancient country lane which provided refuge to at least seven species of bat including the endangered Barbastelle.
    HS2-rail-works-Wendover-007.jpg
  • Preparatory works in Rocky Lane for the HS2 high-speed rail link are viewed on 9th February 2022 in Wendover, United Kingdom. Pictured is a site for an underbridge passing under the HS2 route.
    HS2-rail-works-Wendover-047.jpg
  • Preparatory works in Rocky Lane for the HS2 high-speed rail link are viewed on 9th February 2022 in Wendover, United Kingdom. Pictured is an access point to a haul road towards the Small Dean viaduct launch compound to the north. An underbridge passing under the HS2 route will also be constructed for Rocky Lane.
    HS2-rail-works-Wendover-069.jpg
  • An entrance to the Small Dean viaduct launch compound for the HS2 high-speed rail link is pictured alongside the A413 on 9th February 2022 in Wendover, United Kingdom.
    HS2-rail-works-Wendover-080.jpg
  • Harefield, UK. 16th February, 2022. Traffic queues on Moorhall Road as a result of construction work for the HS2 high-speed rail link. The HS2 route will cross waterways and lakes in the Colne Valley Regional Park by means of the Colne Valley Viaduct which will become the UK's longest railway bridge.
    HS2-works-Harefield-Colne-Valley-007.jpg
  • Harefield, UK. 16th February, 2022. Preparatory works in Savay Lake in the Colne Valley for the HS2 high-speed rail link. The HS2 route will cross waterways and lakes in the Colne Valley Regional Park by means of the Colne Valley Viaduct which will become the UK's longest railway bridge.
    HS2-works-Harefield-Colne-Valley-013.jpg
  • Harefield, UK. 16th February, 2022. Preparatory works alongside the Grand Union Canal in the Colne Valley for the HS2 high-speed rail link. The HS2 route will cross waterways and lakes in the Colne Valley Regional Park by means of the Colne Valley Viaduct which will become the UK's longest railway bridge.
    HS2-works-Harefield-Colne-Valley-014.jpg
  • Stop HS2 banners are pictured outside Harefield Marina on 16th February 2022 in Harefield, United Kingdom. The route for the HS2 high-speed rail link will cross waterways and lakes in the Colne Valley Regional Park by means of the Colne Valley Viaduct which will become the UK's longest railway bridge.
    HS2-works-Harefield-Colne-Valley-003.jpg
  • Great Missenden, UK. 9th February, 2022. A tractor and trailer used in preparations for the HS2 high-speed rail line cross Leather Lane. Several hundred-year-old oak trees have been felled for the infrastructure project along the wildlife-rich ancient country lane which provided refuge to at least seven species of bat including the endangered Barbastelle.
    HS2-rail-works-Wendover-018.jpg
  • Great Missenden, UK. 9th February, 2022. 30-tonne Volvo articulated hauler trucks used to transport soil as part of preparations for the HS2 high-speed rail line cross Leather Lane. Several hundred-year-old oak trees have been felled for the infrastructure project along the wildlife-rich ancient country lane which provided refuge to at least seven species of bat including the endangered Barbastelle.
    HS2-rail-works-Wendover-053.jpg
  • 30-tonne Volvo articulated hauler trucks used to transport soil as part of preparations for the HS2 high-speed rail line cross Leather Lane on 9th February 2022 in Great Missenden, United Kingdom. Several hundred-year-old oak trees have been felled for the infrastructure project along the wildlife-rich ancient country lane which provided refuge to at least seven species of bat including the endangered Barbastelle.
    HS2-rail-works-Wendover-001.jpg
  • Preparatory works in Rocky Lane for the HS2 high-speed rail link are viewed on 9th February 2022 in Wendover, United Kingdom. Pictured is a site for an underbridge passing under the HS2 route.
    HS2-rail-works-Wendover-070.jpg
  • Wendover, UK. 9th February, 2022. Preparatory works in Rocky Lane for the HS2 high-speed rail link. Pictured is an access point to a haul road towards the Small Dean viaduct launch compound to the north. An underbridge passing under the HS2 route will also be constructed for Rocky Lane.
    HS2-rail-works-Wendover-025.jpg
  • Wendover, UK. 9th February, 2022. Preparatory works in Rocky Lane for the HS2 high-speed rail link are viewed pointing east. Pictured is an access point to a haul road towards Leather Lane to the south. An underbridge passing under the HS2 route will also be constructed for Rocky Lane.
    HS2-rail-works-Wendover-072.jpg
  • Wendover, UK. 9th February, 2022. Preparatory works in Rocky Lane for the HS2 high-speed rail link are viewed pointing east. Pictured are access points either side of the lane to a haul road towards the Small Dean viaduct launch compound to the north and towards Leather Lane to the south. An underbridge passing under the HS2 route will also be constructed for Rocky Lane.
    HS2-rail-works-Wendover-017.jpg
  • Preparatory works in Rocky Lane for the HS2 high-speed rail link are viewed on 9th February 2022 in Wendover, United Kingdom. Pictured is an access point to a haul road towards the Small Dean viaduct launch compound to the north. An underbridge passing under the HS2 route will also be constructed for Rocky Lane.
    HS2-rail-works-Wendover-004.jpg
  • Preparatory works for the HS2 high-speed rail link alongside the A413 are pictured on 9th February 2022 in Wendover, United Kingdom. HS2 will cross the A413 by means of the Small Dean viaduct.
    HS2-rail-works-Wendover-095.jpg
  • Preparatory works for the HS2 high-speed rail link alongside the A413 are pictured on 9th February 2022 in Wendover, United Kingdom. HS2 will cross the A413 by means of the Small Dean viaduct.
    HS2-rail-works-Wendover-088.jpg
  • Preparatory works for the Wendover Green tunnel section of the HS2 high-speed rail link are pictured at Wendover Cricket Club on 9th February 2022 in Wendover, United Kingdom. The Wendover Green tunnel, a 1185m cut and cover tunnel, will be constructed alongside the centre of Wendover, with the Ellesborough Road Cricket Club being demolished together with some adjacent residential properties.
    HS2-rail-works-Wendover-127.jpg
  • Harefield, UK. 16th February, 2022. Traffic queues on Moorhall Road as a result of construction work for the HS2 high-speed rail link. The HS2 route will cross waterways and lakes in the Colne Valley Regional Park by means of the Colne Valley Viaduct which will become the UK's longest railway bridge.
    HS2-works-Harefield-Colne-Valley-004.jpg
  • Harefield, UK. 16th February, 2022. Preparatory works in Savay Lake in the Colne Valley for the HS2 high-speed rail link. The HS2 route will cross waterways and lakes in the Colne Valley Regional Park by means of the Colne Valley Viaduct which will become the UK's longest railway bridge.
    HS2-works-Harefield-Colne-Valley-006.jpg
  • Harefield, UK. 16th February, 2022. Preparatory works for the HS2 high-speed rail link are pictured in Savay Lake in the Colne Valley. The HS2 route will cross waterways and lakes in the Colne Valley Regional Park by means of the Colne Valley Viaduct which will become the UK's longest railway bridge.
    HS2-works-Harefield-Colne-Valley-011.jpg
  • Preparatory works in Savay Lake in the Colne Valley for the HS2 high-speed rail link are pictured on 16th February 2022 in Harefield, United Kingdom. The HS2 route will cross waterways and lakes in the Colne Valley Regional Park by means of the Colne Valley Viaduct which will become the UK's longest railway bridge.
    HS2-works-Harefield-Colne-Valley-001.jpg
  • Denham, UK. 9th July, 2021. Flooding in an area cleared of trees and vegetation for electricity pylon relocation works by Babcock in conjunction with the HS2 high-speed rail link.
    HS2-works-Denham-Country-Park-013.jpg
  • Preparatory works in Rocky Lane for the HS2 high-speed rail link are viewed on 9th February 2022 in Wendover, United Kingdom. Pictured is a site for an underbridge passing under the HS2 route.
    HS2-rail-works-Wendover-068.jpg
  • Denham, UK. 16th February, 2022. Preparatory works in the Colne Valley for the HS2 high-speed rail link. The HS2 route will cross waterways and lakes in the Colne Valley Regional Park by means of the Colne Valley Viaduct which will become the UK's longest railway bridge.
    HS2-works-Denham-Colne-Valley-005.jpg
  • Denham, UK. 9th July, 2021. A view across wet woodland in Denham Country Park towards the site of Denham Protection Camp. Denham Protection Camp was set up by environmental activists opposed to the HS2 high-speed rail link in order to try to hinder or prevent electricity pylon relocation works for the project in Denham Country Park.
    HS2-works-Denham-Country-Park-008.jpg
  • Great Missenden, UK. 9th February, 2022. A 30-tonne Volvo articulated hauler truck used to transport soil as part of preparations for the HS2 high-speed rail line crosses Leather Lane. Several hundred-year-old oak trees have been felled for the infrastructure project along the wildlife-rich ancient country lane which provided refuge to at least seven species of bat including the endangered Barbastelle.
    HS2-rail-works-Wendover-055.jpg
  • Great Missenden, UK. 9th February, 2022. 30-tonne Volvo articulated hauler trucks used to transport soil as part of preparations for the HS2 high-speed rail line cross Leather Lane. Several hundred-year-old oak trees have been felled for the infrastructure project along the wildlife-rich ancient country lane which provided refuge to at least seven species of bat including the endangered Barbastelle.
    HS2-rail-works-Wendover-056.jpg
  • A 30-tonne Volvo articulated hauler truck used to transport soil as part of preparations for the HS2 high-speed rail line crosses Leather Lane on 9th February 2022 in Great Missenden, United Kingdom. Several hundred-year-old oak trees have been felled for the infrastructure project along the wildlife-rich ancient country lane which provided refuge to at least seven species of bat including the endangered Barbastelle.
    HS2-rail-works-Wendover-023.jpg
  • A 30-tonne Volvo articulated hauler truck used to transport soil as part of preparations for the HS2 high-speed rail line crosses Leather Lane on 9th February 2022 in Great Missenden, United Kingdom. Several hundred-year-old oak trees have been felled for the infrastructure project along the wildlife-rich ancient country lane which provided refuge to at least seven species of bat including the endangered Barbastelle.
    HS2-rail-works-Wendover-013.jpg
  • Wendover, UK. 9th February, 2022. Preparatory works in Rocky Lane for the HS2 high-speed rail link. Pictured is a site for an underbridge passing under the HS2 route.
    HS2-rail-works-Wendover-075.jpg
  • Wendover, UK. 9th February, 2022. Preparatory works in Rocky Lane for the HS2 high-speed rail link are viewed pointing east. An underbridge passing under the HS2 route will be constructed for Rocky Lane and there are currently also access points either side of the lane to a haul road towards the Small Dean viaduct launch compound to the north and towards Leather Lane to the south.
    HS2-rail-works-Wendover-030.jpg
  • Preparatory works for the HS2 high-speed rail link alongside the A413 are pictured on 9th February 2022 in Wendover, United Kingdom. HS2 will cross the A413 by means of the Small Dean viaduct.
    HS2-rail-works-Wendover-110.jpg
  • Preparatory works for the HS2 high-speed rail link alongside the A413 are pictured on 9th February 2022 in Wendover, United Kingdom. HS2 will cross the A413 by means of the Small Dean viaduct.
    HS2-rail-works-Wendover-107.jpg
  • Preparatory works for the Small Dean viaduct section of the HS2 high-speed rail link are pictured alongside the A413 on 9th February 2022 in Wendover, United Kingdom.
    HS2-rail-works-Wendover-081.jpg
  • Harefield, UK. 16th February, 2022. Preparatory works in Savay Lake in the Colne Valley for the HS2 high-speed rail link. The HS2 route will cross waterways and lakes in the Colne Valley Regional Park by means of the Colne Valley Viaduct which will become the UK's longest railway bridge.
    HS2-works-Harefield-Colne-Valley-016.jpg
  • Harefield, UK. 16th February, 2022. Preparatory works in Savay Lake in the Colne Valley for the HS2 high-speed rail link. The HS2 route will cross waterways and lakes in the Colne Valley Regional Park by means of the Colne Valley Viaduct which will become the UK's longest railway bridge.
    HS2-works-Harefield-Colne-Valley-019.jpg
  • Harefield, UK. 16th February, 2022. Preparatory works for the HS2 high-speed rail link are pictured at Broadwater Lake, a large lake in the Colne Valley which supports large numbers of waterbirds. The HS2 route will cross waterways and lakes in the Colne Valley Regional Park by means of the Colne Valley Viaduct which will become the UK's longest railway bridge.
    HS2-works-Harefield-Colne-Valley-009.jpg
  • Denham, UK. 9th July, 2021. Flooding in an area cleared of trees and vegetation for electricity pylon relocation works by Babcock in conjunction with the HS2 high-speed rail link.
    HS2-works-Denham-Country-Park-010.jpg
  • Denham, UK. 9th July, 2021. A High Court Injunction notice is pictured fixed to fencing around electricity pylon relocation works for the HS2 high-speed rail link in Denham Country Park.
    HS2-works-Denham-Country-Park-002.jpg
  • Preparatory works in Rocky Lane for the HS2 high-speed rail link are viewed on 9th February 2022 in Wendover, United Kingdom. Pictured is an access point to a haul road towards Leather Lane to the south. An underbridge passing under the HS2 route will also be constructed for Rocky Lane.
    HS2-rail-works-Wendover-076.jpg
  • Harefield, UK. 16th February, 2022. Preparatory works for the HS2 high-speed rail link at Broadwater Lake, a large lake in the Colne Valley which supports huge numbers of waterbirds. The HS2 route will cross waterways and lakes in the Colne Valley Regional Park by means of the Colne Valley Viaduct which will become the UK's longest railway bridge.
    HS2-works-Harefield-Colne-Valley-017.jpg
  • Great Missenden, UK. 9th February, 2022. A 30-tonne Volvo articulated hauler truck used to transport soil as part of preparations for the HS2 high-speed rail line crosses Leather Lane. Several hundred-year-old oak trees have been felled for the infrastructure project along the wildlife-rich ancient country lane which provided refuge to at least seven species of bat including the endangered Barbastelle.
    HS2-rail-works-Wendover-031.jpg
  • Great Missenden, UK. 9th February, 2022. A 30-tonne Volvo articulated hauler truck used to transport soil as part of preparations for the HS2 high-speed rail line crosses Leather Lane. Several hundred-year-old oak trees have been felled for the infrastructure project along the wildlife-rich ancient country lane which provided refuge to at least seven species of bat including the endangered Barbastelle.
    HS2-rail-works-Wendover-040.jpg
  • Preparatory works in Rocky Lane for the HS2 high-speed rail link are viewed on 9th February 2022 in Wendover, United Kingdom. Pictured is an access point to a haul road towards Leather Lane to the south. An underbridge passing under the HS2 route will also be constructed for Rocky Lane.
    HS2-rail-works-Wendover-073.jpg
  • Preparatory works in Rocky Lane for the HS2 high-speed rail link are viewed pointing east on 9th February 2022 in Wendover, United Kingdom. Pictured are access points either side of the lane to a haul road towards the Small Dean viaduct launch compound to the north and towards Leather Lane to the south. An underbridge passing under the HS2 route will also be constructed for Rocky Lane.
    HS2-rail-works-Wendover-071.jpg
  • Harefield, UK. 5th February, 2022. A view of works for the HS2 high-speed rail link in the Colne Valley. A viaduct requiring 292 piles driven into the aquifer, a natural water filtration system, is currently being constructed to carry HS2 across lakes and watercourses in the Colne Valley Regional Park.
    HS2-Colne-Valley-Viaduct-site-017.jpg
  • Denham, UK. 9th July, 2021. A view across wet woodland in Denham Country Park towards the site of Denham Protection Camp. Denham Protection Camp was set up by environmental activists opposed to the HS2 high-speed rail link in order to try to hinder or prevent electricity pylon relocation works for the project in Denham Country Park.
    HS2-works-Denham-Country-Park-003.jpg
  • West Hyde, UK. 31st January, 2022. The South Portal site for the Chiltern Tunnel section of the HS2 high-speed rail link. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    HS2-Chiltern-Tunnel-West-Hyde-012.jpg
  • Kenilworth, UK. 24th August, 2020. Crackley Woods Protection Camp. Anti-HS2 activists continue to protest against and attempt to prevent or delay works in connection with the controversial HS2 high-speed rail link from a series of camps along the Phase One route from Euston to north of Birmingham.
    MK-20200824-HS2-Crackley-Woods-prote...jpg
  • West Hyde, UK. 27th February, 2022. Deer are pictured inside perimeter fences around the Chiltern Tunnel South Portal site for the HS2 high-speed rail link. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    Deer-HS2-West-Hyde-tunnel-002.jpg
  • West Hyde, UK. 27th February, 2022. Works close to the South Portal site for the Chiltern Tunnel section of the HS2 high-speed rail link. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    Deer-HS2-West-Hyde-tunnel-003.jpg
  • West Hyde, UK. 31st January, 2022. The South Portal site for the Chiltern Tunnel section of the HS2 high-speed rail link. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    HS2-Chiltern-Tunnel-West-Hyde-011.jpg
  • A viaduct precast factory at the South Portal site for the Chiltern Tunnel section of the HS2 high-speed rail link is pictured on 31st January 2022 in West Hyde, United Kingdom. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    HS2-Chiltern-Tunnel-West-Hyde-002.jpg
  • The South Portal site for the Chiltern Tunnel section of the HS2 high-speed rail link is pictured on 31st January 2022 in West Hyde, United Kingdom. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    HS2-Chiltern-Tunnel-West-Hyde-004.jpg
  • Kenilworth, UK. 24th August, 2020. Crackley Woods Protection Camp. Anti-HS2 activists continue to protest against and attempt to prevent or delay works in connection with the controversial HS2 high-speed rail link from a series of camps along the Phase One route from Euston to north of Birmingham.
    MK-20200824-HS2-Crackley-Woods-prote...jpg
  • West Hyde, UK. 27th February, 2022. A deer hind is pictured inside perimeter fences around the Chiltern Tunnel South Portal site for the HS2 high-speed rail link. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    Deer-HS2-West-Hyde-tunnel-001.jpg
  • West Hyde, UK. 31st January, 2022. Precision-engineered tunnel segments are pictured at the South Portal site for the Chiltern tunnel section of the HS2 high-speed rail link. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    HS2-Chiltern-Tunnel-West-Hyde-008.jpg
  • West Hyde, UK. 31st January, 2022. The South Portal site for the Chiltern Tunnel section of the HS2 high-speed rail link. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    HS2-Chiltern-Tunnel-West-Hyde-010.jpg
  • West Hyde, UK. 31st January, 2022. A viaduct precast factory at the South Portal site for the Chiltern Tunnel section of the HS2 high-speed rail link is pictured from across a field. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    HS2-Chiltern-Tunnel-West-Hyde-014.jpg
  • Precision-engineered tunnel segments are pictured at the South Portal site for the Chiltern tunnel section of the HS2 high-speed rail link on 31st January 2022 in West Hyde, United Kingdom. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    HS2-Chiltern-Tunnel-West-Hyde-009.jpg
  • Preparatory works for the HS2 high-speed rail link at the South Portal site are pictured on 14 September 2020 in West Hyde, United Kingdom. A 17m headwall for the 10-mile Chiltern Tunnel was recently completed at the site as a prelude to three years of drilling through the Chilterns using two German-made 2,000 tonne tunnel boring machines (TBMs).
    HS2-South-Portal-gates-block-056.jpg
  • Kenilworth, UK. 24th August, 2020. Land from which many trees have been cleared by HS2 is viewed from Crackley Woods. Anti-HS2 activists continue to protest against and attempt to prevent or delay works in connection with the controversial HS2 high-speed rail link from a series of camps along the Phase One route from Euston to north of Birmingham.
    MK-20200824-HS2-Crackley-Woods-prote...jpg
  • West Hyde, UK. 31st January, 2022. Precision-engineered tunnel segments are pictured at the South Portal site for the Chiltern tunnel section of the HS2 high-speed rail link. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    HS2-Chiltern-Tunnel-West-Hyde-013.jpg
  • The South Portal site for the Chiltern Tunnel section of the HS2 high-speed rail link is pictured on 31st January 2022 in West Hyde, United Kingdom. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    HS2-Chiltern-Tunnel-West-Hyde-006.jpg
  • The South Portal site for the Chiltern Tunnel section of the HS2 high-speed rail link is pictured on 31st January 2022 in West Hyde, United Kingdom. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    HS2-Chiltern-Tunnel-West-Hyde-007.jpg
  • An anti-HS2 sign is pictured outside Uxbridge Magistrates Court on 15th December 2021 in London, United Kingdom. Two environmental campaigners, partially-sighted former Paralympian James Brown and fellow activist 'Jimmy', were appearing in court charged with criminal damage after allegedly climbing a drilling rig to be used for the HS2 high-speed rail project in February 2020 in order to raise awareness of risks from the infrastructure work to London's water supply from the chalk aquifer below the Colne Valley. The case was adjourned until February 2022.
    Stop-HS2-Drill-Rig-court-case-003.jpg
  • Denham, UK. 11th September, 2020. Two signs placed by environmental activists from HS2 Rebellion at Denham Protection Camp. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link from a series of such protection camps based along the route of the line between London and Birmingham.
    HS2-Denham-Green-camp-works-015.jpg
  • West Hyde, UK. 31st January, 2022. The South Portal site for the Chiltern Tunnel section of the HS2 high-speed rail link. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    HS2-Chiltern-Tunnel-West-Hyde-005.jpg
  • Construction work close to the South Portal site for the Chiltern Tunnel section of the HS2 high-speed rail link is pictured on 31st January 2022 in West Hyde, United Kingdom. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    HS2-Chiltern-Tunnel-West-Hyde-003.jpg
  • Precision-engineered tunnel segments are pictured at the South Portal site for the Chiltern tunnel section of the HS2 high-speed rail link on 31st January 2022 in West Hyde, United Kingdom. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    HS2-Chiltern-Tunnel-West-Hyde-001.jpg
Next