• Facebook
  • Twitter
x

MARK KERRISON | Photojournalist

  • Live News Feed
  • Slideshows
  • About
    • About
    • Data Protection
    • Terms and Conditions
  • Contact
Show Navigation
Cart Lightbox Client Area

Search Results

Refine Search
Match all words
Match any word
Prints
Personal Use
Royalty-Free
Rights-Managed
(leave unchecked to
search all images)
Next
{ 2884 images found }
twitterlinkedinfacebook

Loading ()...

  • Harefield, UK. 13 January, 2020. A team of HS2 construction engineers erects a gate across a public right of way leading to a protection camp established by Stop HS2 activists. Part of the nearby Colne Valley protection camp was evicted by bailiffs last week. 108 ancient woodlands are set to be destroyed by the high-speed rail link and further destruction of trees for HS2 in the Harvil Road area is believed to be imminent.
    Stop-HS2-Harvil-Road-camp-025.jpg
  • Harefield, UK. 13 January, 2020. Stop HS2 activists observe a team of construction engineers erecting a gate across a public right of way leading to an activist protection camp. Activists were evicted by bailiffs from part of the nearby Colne Valley protection camp last week. 108 ancient woodlands are set to be destroyed by the high-speed rail link and further destruction of trees for HS2 in the Harvil Road area is believed to be imminent.
    Stop-HS2-Harvil-Road-camp-015.jpg
  • Harefield, UK. 13 January, 2020. A protection camp inhabited by Stop HS2 activists close to Harvil Road. Part of the nearby Colne Valley protection camp was evicted by bailiffs last week. 108 ancient woodlands are set to be destroyed by the high-speed rail link and further destruction of trees for HS2 in the Harvil Road area is believed to be imminent.
    Stop-HS2-Harvil-Road-camp-021.jpg
  • Harefield, UK. 13 January, 2020. Stop HS2 activists observe a team of construction engineers, accompanied by enforcement agents, erecting a gate across a public right of way leading to an activist protection camp. Activists were evicted by bailiffs from part of the nearby Colne Valley protection camp last week. 108 ancient woodlands are set to be destroyed by the high-speed rail link and further destruction of trees for HS2 in the Harvil Road area is believed to be imminent.
    Stop-HS2-Harvil-Road-camp-012.jpg
  • Harefield, UK. 13 January, 2020. Banners at the Colne Valley protection camp, part of which was evicted by bailiffs last week. 108 ancient woodlands are set to be destroyed by HS2 and further destruction of trees in the Harvil Road area for the high-speed rail link is believed to be imminent.
    Stop-HS2-Harvil-Road-camp-011.jpg
  • Harefield, UK. 13 January, 2020. Stop HS2 activists at the Colne Valley protection camp. Part of the camp was evicted by bailiffs last week. 108 ancient woodlands are set to be destroyed by HS2 and further destruction of trees in the Harvil Road area for the high-speed rail link is believed to be imminent.
    Stop-HS2-Harvil-Road-camp-014.jpg
  • Harefield, UK. 13 January, 2020. Stop HS2 activists sit around a camp fire in a protection camp close to Harvil Road. Part of the nearby Colne Valley protection camp was evicted by bailiffs last week. 108 ancient woodlands are set to be destroyed by the high-speed rail link and further destruction of trees for HS2 in the Harvil Road area is believed to be imminent.
    Stop-HS2-Harvil-Road-camp-026.jpg
  • Harefield, UK. 13 January, 2020. Stop HS2 activists occupy a protection camp close to Harvil Road. Part of the nearby Colne Valley protection camp was evicted by bailiffs last week. 108 ancient woodlands are set to be destroyed by the high-speed rail link and further destruction of trees for HS2 in the Harvil Road area is believed to be imminent.
    Stop-HS2-Harvil-Road-camp-019.jpg
  • Harefield, UK. 13 January, 2020. A senior enforcement agent liaises with Stop HS2 activists observing a team of engineers constructing a gate across a public right of way leading to an activist protection camp. Part of the nearby Colne Valley protection camp was evicted by bailiffs last week. 108 ancient woodlands are set to be destroyed by the high-speed rail link and further destruction of trees for HS2 in the Harvil Road area is believed to be imminent.
    Stop-HS2-Harvil-Road-camp-006.jpg
  • Harefield, UK. 13 January, 2020. Stop HS2 activists observe a team of construction engineers, accompanied by enforcement agents, erecting a gate across a public right of way leading to an activist protection camp. Activists were evicted by bailiffs from part of the nearby Colne Valley protection camp last week. 108 ancient woodlands are set to be destroyed by the high-speed rail link and further destruction of trees for HS2 in the Harvil Road area is believed to be imminent.
    Stop-HS2-Harvil-Road-camp-007.jpg
  • Harefield, UK. 13 January, 2020. Stop HS2 activists observe a team of construction engineers, accompanied by enforcement agents, erecting a gate across a public right of way leading to an activist protection camp. Activists were evicted by bailiffs from part of the nearby Colne Valley protection camp last week. 108 ancient woodlands are set to be destroyed by the high-speed rail link and further destruction of trees for HS2 in the Harvil Road area is believed to be imminent.
    Stop-HS2-Harvil-Road-camp-002.jpg
  • Harefield, UK. 13 January, 2020. Stop HS2 activists observe a team of construction engineers, accompanied by enforcement agents, erecting a gate across a public right of way leading to an activist protection camp. Activists were evicted by bailiffs from part of the nearby Colne Valley protection camp last week. 108 ancient woodlands are set to be destroyed by the high-speed rail link and further destruction of trees for HS2 in the Harvil Road area is believed to be imminent.
    Stop-HS2-Harvil-Road-camp-009.jpg
  • Harefield, UK. 13 January, 2020. Stop HS2 activists occupy a protection camp close to Harvil Road. Part of the nearby Colne Valley protection camp was evicted by bailiffs last week. 108 ancient woodlands are set to be destroyed by the high-speed rail link and further destruction of trees for HS2 in the Harvil Road area is believed to be imminent.
    Stop-HS2-Harvil-Road-camp-017.jpg
  • Harefield, UK. 13 January, 2020. Stop HS2 activists pose alongside a gate being erected by a team of engineers and enforcement agents across a public right of way leading to a protection camp. Part of the nearby Colne Valley protection camp was evicted by bailiffs last week. 108 ancient woodlands are set to be destroyed by the high-speed rail link and further destruction of trees for HS2 in the Harvil Road area is believed to be imminent.
    Stop-HS2-Harvil-Road-camp-001.jpg
  • Harefield, UK. 13 January, 2020. Stop HS2 activists pose alongside a gate being erected by a team of engineers and enforcement agents across a public right of way leading to a protection camp. Part of the nearby Colne Valley protection camp was evicted by bailiffs last week. 108 ancient woodlands are set to be destroyed by the high-speed rail link and further destruction of trees for HS2 in the Harvil Road area is believed to be imminent.
    Stop-HS2-Harvil-Road-camp-023.jpg
  • Harefield, UK. 13 January, 2020. Enforcement agents liaise with Stop HS2 activists during the construction of a gate across a public right of way leading to an activist protection camp. Part of the nearby Colne Valley protection camp was evicted by bailiffs last week. 108 ancient woodlands are set to be destroyed by the high-speed rail link and further destruction of trees for HS2 in the Harvil Road area is believed to be imminent.
    Stop-HS2-Harvil-Road-camp-024.jpg
  • Harefield, UK. 13 January, 2020. A Stop HS2 poster fixed to a pole outside a house close to Harvil Road. 108 ancient woodlands are set to be destroyed by the high-speed rail link and further destruction of trees for HS2 in the Harvil Road area is believed to be imminent.
    Stop-HS2-Harvil-Road-camp-008.jpg
  • Harefield, UK. 13 January, 2020. Stop HS2 activists sit around a camp fire in a protection camp close to Harvil Road. Part of the nearby Colne Valley protection camp was evicted by bailiffs last week. 108 ancient woodlands are set to be destroyed by the high-speed rail link and further destruction of trees for HS2 in the Harvil Road area is believed to be imminent.
    Stop-HS2-Harvil-Road-camp-003.jpg
  • Harefield, UK. 13 January, 2020. Stop HS2 activists sit around a camp fire in a protection camp close to Harvil Road. Part of the nearby Colne Valley protection camp was evicted by bailiffs last week. 108 ancient woodlands are set to be destroyed by the high-speed rail link and further destruction of trees for HS2 in the Harvil Road area is believed to be imminent.
    Stop-HS2-Harvil-Road-camp-013.jpg
  • Harefield, UK. 13 January, 2020. Stop HS2 activists pose alongside a gate being erected by a team of engineers and enforcement agents across a public right of way leading to a protection camp. Part of the nearby Colne Valley protection camp was evicted by bailiffs last week. 108 ancient woodlands are set to be destroyed by the high-speed rail link and further destruction of trees for HS2 in the Harvil Road area is believed to be imminent.
    Stop-HS2-Harvil-Road-camp-016.jpg
  • Harefield, UK. 13 January, 2020. Stop HS2 activists observe a team of construction engineers, accompanied by enforcement agents, erecting a gate across a public right of way leading to an activist protection camp. Activists were evicted by bailiffs from part of the nearby Colne Valley protection camp last week. 108 ancient woodlands are set to be destroyed by the high-speed rail link and further destruction of trees for HS2 in the Harvil Road area is believed to be imminent.
    Stop-HS2-Harvil-Road-camp-020.jpg
  • Harefield, UK. 13 January, 2020. A senior enforcement agent liaises with Stop HS2 activists observing a team of engineers constructing a gate across a public right of way leading to an activist protection camp. Part of the nearby Colne Valley protection camp was evicted by bailiffs last week. 108 ancient woodlands are set to be destroyed by the high-speed rail link and further destruction of trees for HS2 in the Harvil Road area is believed to be imminent.
    Stop-HS2-Harvil-Road-camp-022.jpg
  • Harefield, UK. 13 January, 2020. Stop HS2 activists observe a team of construction engineers, accompanied by enforcement agents, erecting a gate across a public right of way leading to an activist protection camp. Activists were evicted by bailiffs from part of the nearby Colne Valley protection camp last week. 108 ancient woodlands are set to be destroyed by the high-speed rail link and further destruction of trees for HS2 in the Harvil Road area is believed to be imminent.
    Stop-HS2-Harvil-Road-camp-018.jpg
  • Harefield, UK. 13 January, 2020. Stop HS2 activists observe a team of construction engineers, accompanied by enforcement agents, erecting a gate across a public right of way leading to an activist protection camp. Activists were evicted by bailiffs from part of the nearby Colne Valley protection camp last week. 108 ancient woodlands are set to be destroyed by the high-speed rail link and further destruction of trees for HS2 in the Harvil Road area is believed to be imminent.
    Stop-HS2-Harvil-Road-camp-004.jpg
  • Harefield, UK. 13 January, 2020. Digging equipment being used by HS2 construction engineers close to Harvil Road. 108 ancient woodlands are set to be destroyed by the high-speed rail link and further destruction of trees for HS2 in the Harvil Road area is believed to be imminent.
    Stop-HS2-Harvil-Road-camp-010.jpg
  • Stop HS2 campaigner Sarah Green protests outside Hillingdon Civic Centre to highlight the risk of contamination to the public drinking water supply from drilling into the chalk aquifer in the Colne Valley for the HS2 high-speed rail link on 5th February 2022 in Uxbridge, United Kingdom. A viaduct requiring 292 piles driven into the aquifer, a natural water filtration system, is currently being constructed to carry HS2 across lakes and watercourses in the Colne Valley Regional Park and campaigners have called on Hillingdon Council to take action to protect the local environment.
    Stop-HS2-March-for-Water-006.jpg
  • Stop HS2 campaigners take part in a March For Water protest walk from Hillingdon Civic Centre to Harefield Moor to highlight the risk of contamination to the public drinking water supply from drilling into the chalk aquifer in the Colne Valley for the HS2 high-speed rail link on 5th February 2022 in Uxbridge, United Kingdom. A viaduct requiring 292 piles driven into the aquifer, a natural water filtration system, is currently being constructed to carry HS2 across lakes and watercourses in the Colne Valley Regional Park and campaigners have called on Hillingdon Council to take action to protect the local environment.
    Stop-HS2-March-for-Water-002.jpg
  • Harefield, UK. 5th February, 2022. Sarah Green (c) is interviewed on Harefield Moor during a March for Water protest walk by Stop HS2 campaigners to highlight the risk of contamination to the public drinking water supply from drilling into the chalk aquifer in the Colne Valley for the HS2 high-speed rail link. A viaduct requiring 292 piles driven into the aquifer, a natural water filtration system, is currently being constructed to carry HS2 across lakes and watercourses in the Colne Valley Regional Park and campaigners have called on Hillingdon Council to take action to protect the local environment.
    Stop-HS2-March-for-Water-013.jpg
  • Uxbridge, UK. 5th February, 2022. Stop HS2 campaigners, including Sarah Green (l), take part in a March For Water protest walk from Hillingdon Civic Centre to Harefield Moor to highlight the risk of contamination to the public drinking water supply from drilling into the chalk aquifer in the Colne Valley for the HS2 high-speed rail link. A viaduct requiring 292 piles driven into the aquifer, a natural water filtration system, is currently being constructed to carry HS2 across lakes and watercourses in the Colne Valley Regional Park and campaigners have called on Hillingdon Council to take action to protect the local environment.
    Stop-HS2-March-for-Water-023.jpg
  • Preparatory works in Rocky Lane for the HS2 high-speed rail link are viewed on 9th February 2022 in Wendover, United Kingdom. Pictured is an access point to a haul road towards the Small Dean viaduct launch compound to the north. An underbridge passing under the HS2 route will also be constructed for Rocky Lane.
    HS2-rail-works-Wendover-069.jpg
  • Great Missenden, UK. 9th February, 2022. A tractor and trailer used in preparations for the HS2 high-speed rail line cross Leather Lane. Several hundred-year-old oak trees have been felled for the infrastructure project along the wildlife-rich ancient country lane which provided refuge to at least seven species of bat including the endangered Barbastelle.
    HS2-rail-works-Wendover-018.jpg
  • Great Missenden, UK. 9th February, 2022. 30-tonne Volvo articulated hauler trucks used to transport soil as part of preparations for the HS2 high-speed rail line cross Leather Lane. Several hundred-year-old oak trees have been felled for the infrastructure project along the wildlife-rich ancient country lane which provided refuge to at least seven species of bat including the endangered Barbastelle.
    HS2-rail-works-Wendover-053.jpg
  • Wendover, UK. 9th February, 2022. Preparatory works in Rocky Lane for the HS2 high-speed rail link. Pictured is an access point to a haul road towards Leather Lane to the south. An underbridge passing under the HS2 route will also be constructed for Rocky Lane.
    HS2-rail-works-Wendover-074.jpg
  • Wendover, UK. 9th February, 2022. Preparatory works in Rocky Lane for the HS2 high-speed rail link are viewed pointing east. Pictured is an access point to a haul road towards Leather Lane to the south. An underbridge passing under the HS2 route will also be constructed for Rocky Lane.
    HS2-rail-works-Wendover-072.jpg
  • Preparatory works in Rocky Lane for the HS2 high-speed rail link are viewed on 9th February 2022 in Wendover, United Kingdom. Pictured is an access point to a haul road towards the Small Dean viaduct launch compound to the north. An underbridge passing under the HS2 route will also be constructed for Rocky Lane.
    HS2-rail-works-Wendover-004.jpg
  • Wendover, UK. 9th February, 2022. Preparatory works for the Small Dean viaduct section of the HS2 high-speed rail link are pictured alongside the A413.
    HS2-rail-works-Wendover-052.jpg
  • Preparatory works for the Wendover Green tunnel section of the HS2 high-speed rail link are pictured at Wendover Cricket Club on 9th February 2022 in Wendover, United Kingdom. The Wendover Green tunnel, a 1185m cut and cover tunnel, will be constructed alongside the centre of Wendover, with the Ellesborough Road Cricket Club being demolished together with some adjacent residential properties.
    HS2-rail-works-Wendover-127.jpg
  • Great Missenden, UK. 9th February, 2022. A 30-tonne Volvo articulated hauler truck used to transport soil as part of preparations for the HS2 high-speed rail line crosses Leather Lane. Several hundred-year-old oak trees have been felled for the infrastructure project along the wildlife-rich ancient country lane which provided refuge to at least seven species of bat including the endangered Barbastelle.
    HS2-rail-works-Wendover-043.jpg
  • 30-tonne Volvo articulated hauler trucks used to transport soil as part of preparations for the HS2 high-speed rail line cross Leather Lane on 9th February 2022 in Great Missenden, United Kingdom. Several hundred-year-old oak trees have been felled for the infrastructure project along the wildlife-rich ancient country lane which provided refuge to at least seven species of bat including the endangered Barbastelle.
    HS2-rail-works-Wendover-007.jpg
  • Preparatory works in Rocky Lane for the HS2 high-speed rail link are viewed on 9th February 2022 in Wendover, United Kingdom. Pictured is a site for an underbridge passing under the HS2 route.
    HS2-rail-works-Wendover-070.jpg
  • Preparatory works in Rocky Lane for the HS2 high-speed rail link are viewed on 9th February 2022 in Wendover, United Kingdom. Pictured is a site for an underbridge passing under the HS2 route.
    HS2-rail-works-Wendover-047.jpg
  • Wendover, UK. 9th February, 2022. Preparatory works in Rocky Lane for the HS2 high-speed rail link. Pictured is an access point to a haul road towards the Small Dean viaduct launch compound to the north. An underbridge passing under the HS2 route will also be constructed for Rocky Lane.
    HS2-rail-works-Wendover-025.jpg
  • Wendover, UK. 9th February, 2022. Preparatory works in Rocky Lane for the HS2 high-speed rail link are viewed pointing east. Pictured are access points either side of the lane to a haul road towards the Small Dean viaduct launch compound to the north and towards Leather Lane to the south. An underbridge passing under the HS2 route will also be constructed for Rocky Lane.
    HS2-rail-works-Wendover-017.jpg
  • Preparatory works for the HS2 high-speed rail link alongside the A413 are pictured on 9th February 2022 in Wendover, United Kingdom. HS2 will cross the A413 by means of the Small Dean viaduct.
    HS2-rail-works-Wendover-095.jpg
  • A 30-tonne Volvo articulated hauler truck used to transport soil as part of preparations for the HS2 high-speed rail line crosses Leather Lane on 9th February 2022 in Great Missenden, United Kingdom. Several hundred-year-old oak trees have been felled for the infrastructure project along the wildlife-rich ancient country lane which provided refuge to at least seven species of bat including the endangered Barbastelle.
    HS2-rail-works-Wendover-023.jpg
  • A 30-tonne Volvo articulated hauler truck used to transport soil as part of preparations for the HS2 high-speed rail line crosses Leather Lane on 9th February 2022 in Great Missenden, United Kingdom. Several hundred-year-old oak trees have been felled for the infrastructure project along the wildlife-rich ancient country lane which provided refuge to at least seven species of bat including the endangered Barbastelle.
    HS2-rail-works-Wendover-013.jpg
  • 30-tonne Volvo articulated hauler trucks used to transport soil as part of preparations for the HS2 high-speed rail line cross Leather Lane on 9th February 2022 in Great Missenden, United Kingdom. Several hundred-year-old oak trees have been felled for the infrastructure project along the wildlife-rich ancient country lane which provided refuge to at least seven species of bat including the endangered Barbastelle.
    HS2-rail-works-Wendover-001.jpg
  • Wendover, UK. 9th February, 2022. Preparatory works in Rocky Lane for the HS2 high-speed rail link. Pictured is a site for an underbridge passing under the HS2 route.
    HS2-rail-works-Wendover-075.jpg
  • Preparatory works for the HS2 high-speed rail link alongside the A413 are pictured on 9th February 2022 in Wendover, United Kingdom. HS2 will cross the A413 by means of the Small Dean viaduct.
    HS2-rail-works-Wendover-110.jpg
  • An entrance to the Small Dean viaduct launch compound for the HS2 high-speed rail link is pictured alongside the A413 on 9th February 2022 in Wendover, United Kingdom.
    HS2-rail-works-Wendover-080.jpg
  • Preparatory works for the HS2 high-speed rail link alongside the A413 are pictured on 9th February 2022 in Wendover, United Kingdom. HS2 will cross the A413 by means of the Small Dean viaduct.
    HS2-rail-works-Wendover-088.jpg
  • Great Missenden, UK. 9th February, 2022. A 30-tonne Volvo articulated hauler truck used to transport soil as part of preparations for the HS2 high-speed rail line crosses Leather Lane. Several hundred-year-old oak trees have been felled for the infrastructure project along the wildlife-rich ancient country lane which provided refuge to at least seven species of bat including the endangered Barbastelle.
    HS2-rail-works-Wendover-054.jpg
  • Great Missenden, UK. 9th February, 2022. A 30-tonne Volvo articulated hauler truck used to transport soil as part of preparations for the HS2 high-speed rail line crosses Leather Lane. Several hundred-year-old oak trees have been felled for the infrastructure project along the wildlife-rich ancient country lane which provided refuge to at least seven species of bat including the endangered Barbastelle.
    HS2-rail-works-Wendover-050.jpg
  • Preparatory works in Rocky Lane for the HS2 high-speed rail link are viewed on 9th February 2022 in Wendover, United Kingdom. Pictured is a site for an underbridge passing under the HS2 route.
    HS2-rail-works-Wendover-068.jpg
  • Great Missenden, UK. 9th February, 2022. A 30-tonne Volvo articulated hauler truck used to transport soil as part of preparations for the HS2 high-speed rail line crosses Leather Lane. Several hundred-year-old oak trees have been felled for the infrastructure project along the wildlife-rich ancient country lane which provided refuge to at least seven species of bat including the endangered Barbastelle.
    HS2-rail-works-Wendover-031.jpg
  • Great Missenden, UK. 9th February, 2022. 30-tonne Volvo articulated hauler trucks used to transport soil as part of preparations for the HS2 high-speed rail line cross Leather Lane. Several hundred-year-old oak trees have been felled for the infrastructure project along the wildlife-rich ancient country lane which provided refuge to at least seven species of bat including the endangered Barbastelle.
    HS2-rail-works-Wendover-056.jpg
  • Preparatory works in Rocky Lane for the HS2 high-speed rail link are viewed on 9th February 2022 in Wendover, United Kingdom. Pictured is an access point to a haul road towards Leather Lane to the south. An underbridge passing under the HS2 route will also be constructed for Rocky Lane.
    HS2-rail-works-Wendover-073.jpg
  • Preparatory works in Rocky Lane for the HS2 high-speed rail link are viewed on 9th February 2022 in Wendover, United Kingdom. Pictured is an access point to a haul road towards Leather Lane to the south. An underbridge passing under the HS2 route will also be constructed for Rocky Lane.
    HS2-rail-works-Wendover-076.jpg
  • Preparatory works in Rocky Lane for the HS2 high-speed rail link are viewed pointing east on 9th February 2022 in Wendover, United Kingdom. Pictured are access points either side of the lane to a haul road towards the Small Dean viaduct launch compound to the north and towards Leather Lane to the south. An underbridge passing under the HS2 route will also be constructed for Rocky Lane.
    HS2-rail-works-Wendover-071.jpg
  • Wendover, UK. 9th February, 2022. Preparatory works in Rocky Lane for the HS2 high-speed rail link are viewed pointing east. An underbridge passing under the HS2 route will be constructed for Rocky Lane and there are currently also access points either side of the lane to a haul road towards the Small Dean viaduct launch compound to the north and towards Leather Lane to the south.
    HS2-rail-works-Wendover-030.jpg
  • Preparatory works for the HS2 high-speed rail link alongside the A413 are pictured on 9th February 2022 in Wendover, United Kingdom. HS2 will cross the A413 by means of the Small Dean viaduct.
    HS2-rail-works-Wendover-107.jpg
  • Great Missenden, UK. 9th February, 2022. A 30-tonne Volvo articulated hauler truck used to transport soil as part of preparations for the HS2 high-speed rail line crosses Leather Lane. Several hundred-year-old oak trees have been felled for the infrastructure project along the wildlife-rich ancient country lane which provided refuge to at least seven species of bat including the endangered Barbastelle.
    HS2-rail-works-Wendover-055.jpg
  • Preparatory works for the Small Dean viaduct section of the HS2 high-speed rail link are pictured alongside the A413 on 9th February 2022 in Wendover, United Kingdom.
    HS2-rail-works-Wendover-081.jpg
  • Great Missenden, UK. 9th February, 2022. A 30-tonne Volvo articulated hauler truck used to transport soil as part of preparations for the HS2 high-speed rail line crosses Leather Lane. Several hundred-year-old oak trees have been felled for the infrastructure project along the wildlife-rich ancient country lane which provided refuge to at least seven species of bat including the endangered Barbastelle.
    HS2-rail-works-Wendover-040.jpg
  • Preparatory works for the HS2 high-speed rail link alongside the A413 are pictured on 9th February 2022 in Wendover, United Kingdom. HS2 will cross the A413 by means of the Small Dean viaduct.
    HS2-rail-works-Wendover-112.jpg
  • Preparatory works for the HS2 high-speed rail link alongside the A413 are pictured on 9th February 2022 in Wendover, United Kingdom. HS2 will cross the A413 by means of the Small Dean viaduct.
    HS2-rail-works-Wendover-109.jpg
  • Preparatory works for the HS2 high-speed rail link alongside the A413 are pictured on 9th February 2022 in Wendover, United Kingdom. HS2 will cross the A413 by means of the Small Dean viaduct.
    HS2-rail-works-Wendover-106.jpg
  • Wendover, UK. 9th February, 2022. Preparatory works for the HS2 high-speed rail link are pictured alongside the A413. HS2 will cross the A413 by means of the Small Dean viaduct.
    HS2-rail-works-Wendover-093.jpg
  • Preparatory works for the Grove Farm underbridge for the HS2 high-speed rail link are pictured from Bacombe Lane on 9th February 2022 in Wendover, United Kingdom. HS2 will enter the Wendover Green tunnel, a 1185m cut and cover tunnel, alongside Bacombe Lane.
    HS2-rail-works-Wendover-058.jpg
  • Wellwick House is viewed from Bacombe Hill with works for the HS2 high-speed rail link beyond on 9th February 2022 in Wendover, United Kingdom. Wellwick House is a Grade 2* listed Elizabethan manor house mentioned in Pevsner’s Buildings of England.
    HS2-rail-works-Wendover-011.jpg
  • Wendover, UK. 9th February, 2022. A closed public footpath and works for the Wendover Green Tunnel section of the HS2 high-speed rail link are viewed from Ellesborough Road. The Wendover Green tunnel, a 1185m cut and cover tunnel, will run alongside the centre of Wendover.
    HS2-rail-works-Wendover-021.jpg
  • A boarded up residential property is pictured on Ellesborough Road on 9th February 2022 in Wendover, United Kingdom. A number of properties on Ellesborough Road will be demolished as part of preparations for the HS2 high-speed rail link.
    HS2-rail-works-Wendover-009.jpg
  • Wendover, UK. 9th February, 2022. A Wendover sign is pictured on Ellesborough Road. A number of properties on Ellesborough Road will be demolished as part of preparations for the HS2 high-speed rail link.
    HS2-rail-works-Wendover-129.jpg
  • Preparatory works for the HS2 high-speed rail link alongside the A413 are pictured on 9th February 2022 in Wendover, United Kingdom. HS2 will cross the A413 by means of the Small Dean viaduct.
    HS2-rail-works-Wendover-108.jpg
  • Preparatory works for the HS2 high-speed rail link alongside the A413 are pictured on 9th February 2022 in Wendover, United Kingdom. HS2 will cross the A413 by means of the Small Dean viaduct.
    HS2-rail-works-Wendover-099.jpg
  • The site of the former Stop HS2 Wendover Active Resistance (WAR) Camp is pictured alongside the A413 on 9th February 2022 in Wendover, United Kingdom. Environmental activists opposed to the HS2 high-speed rail link set up the camp at a location at which HS2 will cross the A413 by means of the Small Dean viaduct but were evicted by bailiffs acting for HS2 Ltd in October-November 2021.
    HS2-rail-works-Wendover-084.jpg
  • Part of the site of the former Stop HS2 Wendover Active Resistance (WAR) Camp is pictured alongside the A413 on 9th February 2022 in Wendover, United Kingdom. Environmental activists opposed to the HS2 high-speed rail link set up the camp at a location at which HS2 will cross the A413 by means of the Small Dean viaduct but were evicted by bailiffs acting for HS2 Ltd in October-November 2021.
    HS2-rail-works-Wendover-111.jpg
  • Wendover, UK. 9th February, 2022. Preparatory works for the HS2 high-speed rail link are pictured on the site of the former Road Barn Farm alongside the A413. HS2 will cross the A413 by means of the Small Dean viaduct.
    HS2-rail-works-Wendover-037.jpg
  • Preparatory works for the Wendover Green tunnel section of the HS2 high-speed rail link are pictured on Bacombe Lane on 9th February 2022 in Wendover, United Kingdom. HS2 will enter the Wendover Green tunnel, a 1185m cut and cover tunnel, alongside Bacombe Lane.
    HS2-rail-works-Wendover-065.jpg
  • The Wendover Green Tunnel North Satellite Compound for the HS2 high-speed rail link is viewed from Ellesborough Road on 9th February 2022 in Wendover, United Kingdom. The Wendover Green tunnel, a 1185m cut and cover tunnel, will run alongside the centre of Wendover.
    HS2-rail-works-Wendover-119.jpg
  • The Wendover Green Tunnel North Satellite Compound for the HS2 high-speed rail link is pictured from Ellesborough Road on 9th February 2022 in Wendover, United Kingdom. The Wendover Green tunnel, a 1185m cut and cover tunnel, will run alongside the centre of Wendover.
    HS2-rail-works-Wendover-123.jpg
  • Wendover, UK. 9th February, 2022. Boarded up residential properties are pictured on Ellesborough Road. A number of properties on Ellesborough Road will be demolished as part of preparations for the HS2 high-speed rail link.
    HS2-rail-works-Wendover-027.jpg
  • A boarded up residential property is pictured on Ellesborough Road on 9th February 2022 in Wendover, United Kingdom. A number of properties on Ellesborough Road will be demolished as part of preparations for the HS2 high-speed rail link.
    HS2-rail-works-Wendover-003.jpg
  • Preparatory works for the HS2 high-speed rail link alongside the A413 are pictured on 9th February 2022 in Wendover, United Kingdom. HS2 will cross the A413 by means of the Small Dean viaduct.
    HS2-rail-works-Wendover-046.jpg
  • Preparatory works for the HS2 high-speed rail link on the site of the former Road Barn Farm alongside the A413 are pictured on 9th February 2022 in Wendover, United Kingdom. HS2 will cross the A413 by means of the Small Dean viaduct.
    HS2-rail-works-Wendover-083.jpg
  • Preparatory works for the HS2 high-speed rail link on the site of the former Road Barn Farm alongside the A413 are pictured on 9th February 2022 in Wendover, United Kingdom. HS2 will cross the A413 by means of the Small Dean viaduct.
    HS2-rail-works-Wendover-049.jpg
  • Preparatory works for the Small Dean viaduct section of the HS2 high-speed rail link are pictured alongside the A413 on 9th February 2022 in Wendover, United Kingdom.
    HS2-rail-works-Wendover-086.jpg
  • Part of the site of the former Stop HS2 Wendover Active Resistance (WAR) Camp is pictured alongside the A413 on 9th February 2022 in Wendover, United Kingdom. Environmental activists opposed to the HS2 high-speed rail link set up the camp at a location at which HS2 will cross the A413 by means of the Small Dean viaduct but were evicted by bailiffs acting for HS2 Ltd in October-November 2021.
    HS2-rail-works-Wendover-091.jpg
  • Wendover, UK. 9th February, 2022. Preparatory works for the HS2 high-speed rail link are pictured alongside the A413. HS2 will cross the A413 by means of the Small Dean viaduct.
    HS2-rail-works-Wendover-029.jpg
  • Wendover, UK. 9th February, 2022. Preparatory works for the HS2 high-speed rail link are pictured alongside the A413. HS2 will cross the A413 by means of the Small Dean viaduct.
    HS2-rail-works-Wendover-092.jpg
  • Preparatory works for the HS2 high-speed rail link are pictured alongside the A413 on 9th February 2022 in Wendover, United Kingdom. HS2 will cross the A413 by means of the Small Dean viaduct.
    HS2-rail-works-Wendover-005.jpg
  • Preparatory works for the Wendover Green tunnel section of the HS2 high-speed rail link are pictured at Wendover Cricket Club on 9th February 2022 in Wendover, United Kingdom. The Wendover Green tunnel, a 1185m cut and cover tunnel, will be constructed alongside the centre of Wendover, with the Ellesborough Road Cricket Club being demolished together with some adjacent residential properties.
    HS2-rail-works-Wendover-128.jpg
  • Preparatory works for the Grove Farm underbridge for the HS2 high-speed rail link are pictured from Bacombe Lane on 9th February 2022 in Wendover, United Kingdom. HS2 will enter the Wendover Green tunnel, a 1185m cut and cover tunnel, alongside Bacombe Lane.
    HS2-rail-works-Wendover-060.jpg
  • Preparatory works for the Grove Farm underbridge for the HS2 high-speed rail link are pictured from Bacombe Lane on 9th February 2022 in Wendover, United Kingdom. HS2 will enter the Wendover Green tunnel, a 1185m cut and cover tunnel, alongside Bacombe Lane.
    HS2-rail-works-Wendover-064.jpg
  • Preparatory works for the Wendover Green tunnel section of the HS2 high-speed rail link are pictured on Bacombe Lane on 9th February 2022 in Wendover, United Kingdom. HS2 will enter the Wendover Green tunnel, a 1185m cut and cover tunnel, alongside Bacombe Lane.
    HS2-rail-works-Wendover-062.jpg
  • Preparatory works for the Wendover Green tunnel section of the HS2 high-speed rail link are pictured on Bacombe Lane on 9th February 2022 in Wendover, United Kingdom. HS2 will enter the Wendover Green tunnel, a 1185m cut and cover tunnel, alongside Bacombe Lane.
    HS2-rail-works-Wendover-067.jpg
  • Preparatory works for the Wendover Green tunnel section of the HS2 high-speed rail link are pictured close to Bacombe Lane on 9th February 2022 in Wendover, United Kingdom. HS2 will enter the Wendover Green tunnel, a 1185m cut and cover tunnel, alongside Bacombe Lane.
    HS2-rail-works-Wendover-059.jpg
  • The Wendover Green Tunnel North Satellite Compound for the HS2 high-speed rail link is pictured from Bacombe Hill on 9th February 2022 in Wendover, United Kingdom. The Wendover Green tunnel, a 1185m cut and cover tunnel, will run alongside the centre of Wendover.
    HS2-rail-works-Wendover-010.jpg
  • Boarded up residential properties are pictured on Ellesborough Road on 9th February 2022 in Wendover, United Kingdom. A number of properties on Ellesborough Road will be demolished as part of preparations for the HS2 high-speed rail link.
    HS2-rail-works-Wendover-135.jpg
  • Boarded up residential properties are pictured on Ellesborough Road on 9th February 2022 in Wendover, United Kingdom. A number of properties on Ellesborough Road will be demolished as part of preparations for the HS2 high-speed rail link.
    HS2-rail-works-Wendover-132.jpg
Next