HS2 Ventilation Shaft Works Chalfont St Giles
Add to Cart Add to Lightbox DownloadChalfont St Giles, UK. 30 March, 2021. A general view of a temporary haul road constructed in connection with works for a ventilation shaft for the Chiltern Tunnel section of the HS2 high-speed rail link. The works, off Bottom House Farm Lane, include the construction of the ventilation shaft and an embankment as well as the temporary haul road.
- Filename
- HS2-Chalfont-St-Giles-works-012.jpg
- Copyright
- Copyright 2021 Mark Kerrison
- Image Size
- 5123x3415 / 4.0MB
- https://www.markkerrison.com/p/licensing
- https://www.markkerrison.com/contact
-
access road bottom house farm lane britain british buckinghamshire bucks chalfont st giles chiltern chiltern tunnel chilterns construction countryside digging england english environment environmental excavation farmland fields great britain haul road high speed high speed 2 high speed rail high speed rail link high speed two high-speed high-speed 2 high-speed rail high-speed rail link high-speed two hs2 infrastructure line link rail railway road temporary haul road temporary road train transport transportation trees uk united kingdom vent shaft ventilation shaft woods works
- Contained in galleries