HS2 Construction Works Harefield
Add to Cart Add to Lightbox DownloadWest Hyde, UK. 16th February, 2022. Preparatory works for the Chiltern Tunnel section of the HS2 high-speed rail link. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
- Filename
- HS2-works-West-Hyde-Colne-Valley-002.jpg
- Copyright
- Copyright 2022 Mark Kerrison
- Image Size
- 5123x3415 / 6.1MB
- https://www.markkerrison.com/p/licensing
- https://www.markkerrison.com/contact
-
britain british buckinghamshire bucks chiltern tunnel construction england english environment environmental factory high speed 2 high speed rail high speed rail link high speed two high-speed 2 high-speed rail high-speed rail link high-speed two hs2 infrastructure line link precast factory rail railway site south portal transport tunnel uk united kingdom viaduct precast factory west hyde
- Contained in galleries

