• Facebook
  • Twitter
x

MARK KERRISON | Photojournalist

  • Live News Feed
  • Slideshows
  • About
    • About
    • Data Protection
    • Terms and Conditions
  • Contact
Show Navigation
Cart Lightbox Client Area
1 of 1

HS2 Construction Works Harefield

Add to Cart Add to Lightbox Download

West Hyde, UK. 16th February, 2022. Preparatory works for the Chiltern Tunnel section of the HS2 high-speed rail link. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.

Filename
HS2-works-West-Hyde-Colne-Valley-002.jpg
Copyright
Copyright 2022 Mark Kerrison
Image Size
5123x3415 / 6.1MB
https://www.markkerrison.com/p/licensing
https://www.markkerrison.com/contact
britain british buckinghamshire bucks chiltern tunnel construction england english environment environmental factory high speed 2 high speed rail high speed rail link high speed two high-speed 2 high-speed rail high-speed rail link high-speed two hs2 infrastructure line link precast factory rail railway site south portal transport tunnel uk united kingdom viaduct precast factory west hyde
Contained in galleries
twitterlinkedinfacebook
West Hyde, UK. 16th February, 2022. Preparatory works for the Chiltern Tunnel section of the HS2 high-speed rail link. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.