HS2 Ventilation Shaft Works Chalfont St Giles
Add to Cart Add to Lightbox DownloadChalfont St Giles, UK. 30 March, 2021. HS2 contractors work alongside a temporary haul road constructed in connection with works for a ventilation shaft for the Chiltern Tunnel section of the HS2 high-speed rail link. The works, off Bottom House Farm Lane, include the construction of the ventilation shaft and an embankment as well as the temporary haul road.
- Filename
- HS2-Chalfont-St-Giles-works-007.jpg
- Copyright
- Copyright 2021 Mark Kerrison
- Image Size
- 5123x3415 / 4.9MB
- https://www.markkerrison.com/p/licensing
- https://www.markkerrison.com/contact
-
10mph speed limit access road bottom house farm lane britain british buckinghamshire bucks chalfont st giles chiltern chiltern tunnel chilterns construction contractor digging england english environment environmental excavation fence fencing great britain haul road high speed high speed 2 high speed rail high speed rail link high speed two high-speed high-speed 2 high-speed rail high-speed rail link high-speed two hs2 hs2 worker infrastructure line link machinery rail railway road speed limit temporary haul road temporary road train transport transportation uk united kingdom vent shaft ventilation shaft worker works
- Contained in galleries