• Facebook
  • Twitter
x

MARK KERRISON | Photojournalist

  • Live News Feed
  • Slideshows
  • About
    • About
    • Data Protection
    • Terms and Conditions
  • Contact
Show Navigation
Cart Lightbox Client Area
1 of 1

Cladding Removal At Nova House Slough

Add to Lightbox Download

Fire safety remediation works continue at Nova House on 12th January 2022 in Slough, United Kingdom. Works at the block of flats, estimated at £17.8m, will include the removal of dangerous aluminium composite material cladding which failed two flammability tests carried out after the Grenfell Tower fire as well as the installation of fire safety measures.

Filename
Cladding-Nova-House-Slough-001.jpg
Copyright
Copyright 2022 Mark Kerrison
Image Size
5123x3416 / 6.1MB
https://www.markkerrison.com/p/licensing
https://www.markkerrison.com/contact
aluminium composite aluminium composite material apartments berkshire block block of flats britain british cladding england english fire safety flats housing nova house remediation removal replacement scaffolding slough uk united kingdom works
Contained in galleries
twitterlinkedinfacebook
Fire safety remediation works continue at Nova House on 12th January 2022 in Slough, United Kingdom. Works at the block of flats, estimated at £17.8m, will include the removal of dangerous aluminium composite material cladding which failed two flammability tests carried out after the Grenfell Tower fire as well as the installation of fire safety measures.