Cladding Removal At Nova House Slough
Add to Lightbox DownloadFire safety remediation works continue at Nova House on 12th January 2022 in Slough, United Kingdom. Works at the block of flats, estimated at £17.8m, will include the removal of dangerous aluminium composite material cladding which failed two flammability tests carried out after the Grenfell Tower fire as well as the installation of fire safety measures.
- Filename
- Cladding-Nova-House-Slough-001.jpg
- Copyright
- Copyright 2022 Mark Kerrison
- Image Size
- 5123x3416 / 6.1MB
- https://www.markkerrison.com/p/licensing
- https://www.markkerrison.com/contact
- Contained in galleries

