Denham Against HS2 Sign Denham
Add to Cart Add to Lightbox DownloadDenham, UK. 5th November, 2020. A sign produced by the Denham Against HS2 and Stop HS2 campaigns. Prime Minister Boris Johnson has advised that construction work may continue during the second national coronavirus lockdown but those working on construction projects are required to adhere to Site Operating Procedures including social distancing guidelines to help prevent the spread of COVID-19.
- Filename
- HS2-Denham-bridge-building-026.jpg
- Copyright
- Copyright 2020 Mark Kerrison
- Image Size
- 5122x3415 / 5.7MB
- https://www.markkerrison.com/p/licensing
- https://www.markkerrison.com/contact
-
activism britain british buckinghamshire colne valley construction coronavirus covid covid-19 denham denham against hs2 england english environment environmental great britain high speed high speed 2 high speed two high-speed high-speed 2 high-speed rail link high-speed two hoarding hs2 line link pandemic protest rail railway shut down hs2 sign stop hs2 stop the virus train transport uk united kingdom virus
- Contained in galleries
- 2020-11-05 HS2 bridge building in Denham: Lockdown 2 Day 1