HS2 Denham Ford Bridge Building
Add to Lightbox DownloadHS2 security guards and enforcement agents monitor two anti-HS2 activists wading in the river Colne at Denham Ford in order to try to delay bridge building works for the HS2 high-speed rail link on the first day of the second national coronavirus lockdown on 5 November 2020 in Denham, United Kingdom. Prime Minister Boris Johnson has advised that construction work may continue during the second lockdown but those working on construction projects are required to adhere to Site Operating Procedures including social distancing guidelines to help prevent the spread of COVID-19.
- Filename
- HS2-Denham-bridge-building-014.jpg
- Copyright
- Copyright 2020 Mark Kerrison
- Image Size
- 5123x3415 / 7.7MB
- https://www.markkerrison.com/p/licensing
- https://www.markkerrison.com/contact
-
activism activist bailiff bailiffs bridge britain british buckinghamshire cherry picker colne colne river colne valley construction coronavirus covid covid-19 denham denham country park denham ford denham ford protection camp denham protection camp enforcement agent enforcement agents england english environment environmental great britain high speed high speed 2 high speed two high-speed high-speed 2 high-speed rail link high-speed two hs2 hs2 rebellion hs2 security hs2 security guard hs2 security guards hs2 worker line link lockdown national eviction team pandemic protest protester rail railway river river colne second lockdown security security guard security guards site operating procedures social distance social distancing stop hs2 train transport uk united kingdom
- Contained in galleries
- 2020-11-05 HS2 bridge building in Denham: Lockdown 2 Day 1