HS2 Chiltern Tunnel South Portal Site West Hyde
Add to Lightbox DownloadAn excavator moves the remnants of felled trees in front of precision-engineered tunnel segments at the South Portal site for the Chiltern tunnel section of the HS2 high-speed rail link on 9th July 2021 in West Hyde, United Kingdom. HS2 Ltd has announced the launch of the second 2,000-tonne tunnel boring machine (TBM), named Cecilia after astronomer and astrophysicist Cecilia Payne-Gaposchkin, to excavate a second 10-mile tunnel beneath the Chilterns.
- Filename
- HS2-South-Portal-West-Hyde-004.jpg
- Copyright
- Copyright 2021 Mark Kerrison
- Image Size
- 5123x3416 / 4.8MB
- https://www.markkerrison.com/p/licensing
- https://www.markkerrison.com/contact
-
boring branches britain british chiltern chiltern hills chiltern tunnel chilterns construction drill drilling england english environment environmental excavation excavator felled felling high speed 2 high speed rail high speed rail link high speed two high-speed 2 high-speed rail high-speed rail link high-speed two hs2 hs2 high speed rail link hs2 high-speed rail link infrastructure machinery rail railway roots segments south portal tbm tilehouse lane transport transportation trees trunks tunnel tunnel boring machine tunnel segments uk united kingdom west hyde wood chip works
- Contained in galleries
- 2021-07-09 HS2 Chiltern Tunnel South Portal works West Hyde