• Facebook
  • Twitter
x

MARK KERRISON | Photojournalist

  • Live News Feed
  • Slideshows
  • About
    • About
    • Data Protection
    • Terms and Conditions
  • Contact
Show Navigation
Archive
Cart Lightbox Client Area
Add to Cart Download
twitterlinkedinfacebook

2022-01-31 HS2 Chiltern Tunnel works

14 images Created 1 Feb 2022

West Hyde, UK. 31st January, 2022. The South Portal site for the Chiltern Tunnel section of the HS2 high-speed rail link. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
View: 100 | All

Loading ()...

  • Precision-engineered tunnel segments are pictured at the South Portal site for the Chiltern tunnel section of the HS2 high-speed rail link on 31st January 2022 in West Hyde, United Kingdom. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    HS2-Chiltern-Tunnel-West-Hyde-001.jpg
  • A viaduct precast factory at the South Portal site for the Chiltern Tunnel section of the HS2 high-speed rail link is pictured on 31st January 2022 in West Hyde, United Kingdom. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    HS2-Chiltern-Tunnel-West-Hyde-002.jpg
  • Construction work close to the South Portal site for the Chiltern Tunnel section of the HS2 high-speed rail link is pictured on 31st January 2022 in West Hyde, United Kingdom. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    HS2-Chiltern-Tunnel-West-Hyde-003.jpg
  • The South Portal site for the Chiltern Tunnel section of the HS2 high-speed rail link is pictured on 31st January 2022 in West Hyde, United Kingdom. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    HS2-Chiltern-Tunnel-West-Hyde-004.jpg
  • West Hyde, UK. 31st January, 2022. The South Portal site for the Chiltern Tunnel section of the HS2 high-speed rail link. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    HS2-Chiltern-Tunnel-West-Hyde-005.jpg
  • The South Portal site for the Chiltern Tunnel section of the HS2 high-speed rail link is pictured on 31st January 2022 in West Hyde, United Kingdom. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    HS2-Chiltern-Tunnel-West-Hyde-006.jpg
  • The South Portal site for the Chiltern Tunnel section of the HS2 high-speed rail link is pictured on 31st January 2022 in West Hyde, United Kingdom. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    HS2-Chiltern-Tunnel-West-Hyde-007.jpg
  • West Hyde, UK. 31st January, 2022. Precision-engineered tunnel segments are pictured at the South Portal site for the Chiltern tunnel section of the HS2 high-speed rail link. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    HS2-Chiltern-Tunnel-West-Hyde-008.jpg
  • Precision-engineered tunnel segments are pictured at the South Portal site for the Chiltern tunnel section of the HS2 high-speed rail link on 31st January 2022 in West Hyde, United Kingdom. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    HS2-Chiltern-Tunnel-West-Hyde-009.jpg
  • West Hyde, UK. 31st January, 2022. The South Portal site for the Chiltern Tunnel section of the HS2 high-speed rail link. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    HS2-Chiltern-Tunnel-West-Hyde-010.jpg
  • West Hyde, UK. 31st January, 2022. The South Portal site for the Chiltern Tunnel section of the HS2 high-speed rail link. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    HS2-Chiltern-Tunnel-West-Hyde-011.jpg
  • West Hyde, UK. 31st January, 2022. The South Portal site for the Chiltern Tunnel section of the HS2 high-speed rail link. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    HS2-Chiltern-Tunnel-West-Hyde-012.jpg
  • West Hyde, UK. 31st January, 2022. Precision-engineered tunnel segments are pictured at the South Portal site for the Chiltern tunnel section of the HS2 high-speed rail link. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    HS2-Chiltern-Tunnel-West-Hyde-013.jpg
  • West Hyde, UK. 31st January, 2022. A viaduct precast factory at the South Portal site for the Chiltern Tunnel section of the HS2 high-speed rail link is pictured from across a field. Two 2,000-tonne tunnel boring machines are being used to create the 10-mile Chiltern Tunnel beneath the Chiltern Hills which will be the longest tunnel on the HS2 route between London and the West Midlands.
    HS2-Chiltern-Tunnel-West-Hyde-014.jpg