• Facebook
  • Twitter
x

MARK KERRISON | Photojournalist

  • Live News Feed
  • Slideshows
  • About
    • About
    • Data Protection
    • Terms and Conditions
  • Contact
Show Navigation
Archive
Cart Lightbox Client Area
Add to Cart Download
twitterlinkedinfacebook

2021-04-09 HS2 tree felling in Wendover

22 images Created 12 Apr 2021

Wendover, UK. 9th April, 2021. A site alongside the A413 where trees are currently being felled for the HS2 high-speed rail link. Tree felling work for the project is now taking place at several locations between Great Missenden and Wendover in the Chilterns AONB, including in ancient woodland at Jones Hill Wood.
View: 100 | All

Loading ()...

  • HS2 contractors monitor the site of the former Road Barn Farm alongside the A413 where trees have recently been felled for the HS2 high-speed rail link on 9th April 2021 in Wendover, United Kingdom. Tree felling work for the project is now taking place at several locations between Great Missenden and Wendover in the Chilterns AONB, including at Jones Hill Wood.
    HS2-tree-felling-Wendover-001.jpg
  • A sign outside Stop HS2’s Wendover Active Resistance Camp indicating a site on the opposite side of the A413 currently being cleared of trees and vegetation by contractors working on the HS2 high-speed rail link is pictured on 9th April 2021 in Wendover, United Kingdom. Tree felling work for the project is now taking place at several locations between Great Missenden and Wendover in the Chilterns AONB, including at Jones Hill Wood.
    HS2-tree-felling-Wendover-002.jpg
  • HS2 contractors use mobile phones to film a press photographer from the site of the former Road Barn Farm alongside the A413 where trees have recently been felled for the HS2 high-speed rail link on 9th April 2021 in Wendover, United Kingdom. Tree felling work for the project is now taking place at several locations between Great Missenden and Wendover in the Chilterns AONB, including at Jones Hill Wood.
    HS2-tree-felling-Wendover-003.jpg
  • A sign calling for a halt to the destruction of irreplaceable ecosystems for the HS2 high-speed rail link is pictured outside Stop HS2’s Wendover Active Resistance Camp on 9th April 2021 in Wendover, United Kingdom. Tree felling work for the project is now taking place at several locations between Great Missenden and Wendover in the Chilterns AONB, including directly opposite the camp.
    HS2-tree-felling-Wendover-004.jpg
  • Wendover, UK. 9th April, 2021. The site of the former Road Barn Farm alongside the A413 where trees are currently being felled for the HS2 high-speed rail link. Tree felling work for the project is now taking place at several locations between Great Missenden and Wendover in the Chilterns AONB, including at Jones Hill Wood.
    HS2-tree-felling-Wendover-005.jpg
  • A sign outside Stop HS2’s Wendover Active Resistance Camp referring to traffic delays on the A413 caused by tree felling works for the HS2 high-speed rail link on the opposite side of the road is pictured on 9th April 2021 in Wendover, United Kingdom. Tree felling work for the project is now taking place at several locations between Great Missenden and Wendover in the Chilterns AONB, including at Jones Hill Wood.
    HS2-tree-felling-Wendover-006.jpg
  • Wendover, UK. 9th April, 2021. A HS2 contractor uses a mobile phone to film a press photographer from the site of the former Road Barn Farm alongside the A413 where trees have recently been felled for the HS2 high-speed rail link. Tree felling work for the project is now taking place at several locations between Great Missenden and Wendover in the Chilterns AONB, including at Jones Hill Wood.
    HS2-tree-felling-Wendover-007.jpg
  • Wendover, UK. 9th April, 2021. A sign reading End Brutality Against Protectors is pictured outside Wendover Active Resistance Camp, which is occupied by activists opposed to the HS2 high-speed rail link. Tree felling work for the project is now taking place at several locations between Great Missenden and Wendover in the Chilterns AONB, including directly opposite the camp.
    HS2-tree-felling-Wendover-008.jpg
  • Wendover, UK. 9th April, 2021. The site of the former Road Barn Farm alongside the A413 where trees are currently being felled for the HS2 high-speed rail link. Tree felling work for the project is now taking place at several locations between Great Missenden and Wendover in the Chilterns AONB, including at Jones Hill Wood.
    HS2-tree-felling-Wendover-009.jpg
  • Wendover, UK. 9th April, 2021. A banner accusing HS2 Ltd of ecocide hangs outside the Wendover Active Resistance Camp on 9th April 2021 in Wendover, United Kingdom. Tree felling work for the project is now taking place at several locations between Great Missenden and Wendover in the Chilterns AONB, including opposite the camp and at Jones Hill Wood.
    HS2-tree-felling-Wendover-010.jpg
  • Wendover, UK. 9th April, 2021. The site of the former Road Barn Farm alongside the A413 where trees are currently being felled for the HS2 high-speed rail link. Tree felling work for the project is now taking place at several locations between Great Missenden and Wendover in the Chilterns AONB, including at Jones Hill Wood.
    HS2-tree-felling-Wendover-011.jpg
  • A Kill The Bill banner hangs from a wall of the Wendover Active Resistance Camp, which is occupied by activists opposed to the HS2 high-speed rail link, on 9th April 2021 in Wendover, United Kingdom. Tree felling work for the project is now taking place at several locations between Great Missenden and Wendover in the Chilterns AONB, including directly opposite Wendover Active Resistance Camp.
    HS2-tree-felling-Wendover-012.jpg
  • Wendover, UK. 9th April, 2021. A sign outside Stop HS2’s Wendover Active Resistance Camp referring to a site on the opposite side of the A413 currently being cleared of trees and vegetation by contractors working on the HS2 high-speed rail link. Tree felling work for the project is now taking place at several locations between Great Missenden and Wendover in the Chilterns AONB, including at Jones Hill Wood.
    HS2-tree-felling-Wendover-013.jpg
  • Wendover, UK. 9th April, 2021. HS2 contractors monitor the site of the former Road Barn Farm alongside the A413 where trees are currently being felled for the HS2 high-speed rail link. Tree felling work for the project is now taking place at several locations between Great Missenden and Wendover in the Chilterns AONB, including at Jones Hill Wood.
    HS2-tree-felling-Wendover-014.jpg
  • Wendover, UK. 9th April, 2021. Signs reading ‘Environmental Disaster?’ and ‘Stop HS2’ are pictured opposite a site currently being cleared of trees and vegetation by HS2 contractors on 9th April 2021 in Wendover, United Kingdom. Tree felling work for the project is now taking place at several locations between Great Missenden and Wendover in the Chilterns AONB, including at Jones Hill Wood.
    HS2-tree-felling-Wendover-015.jpg
  • Wendover, UK. 9th April, 2021. HS2 security guards stand behind a fence around trees lining the A413 during tree felling operations for the HS2 high-speed rail link. Tree felling work for the project is now taking place at several locations between Great Missenden and Wendover in the Chilterns AONB, including at Jones Hill Wood.
    HS2-tree-felling-Wendover-016.jpg
  • Wendover, UK. 9th April, 2021. A mural critical of Thames Valley Police’s relationship with HS2 Ltd is pictured on the exterior of Wendover Active Resistance Camp. Tree felling work for the HS2 high-speed rail link project is now taking place at several locations between Great Missenden and Wendover in the Chilterns AONB, including directly opposite Wendover Active Resistance Camp.
    HS2-tree-felling-Wendover-017.jpg
  • Wendover, UK. 9th April, 2021. The site of the former Road Barn Farm alongside the A413 where trees are currently being felled for the HS2 high-speed rail link. Tree felling work for the project is now taking place at several locations between Great Missenden and Wendover in the Chilterns AONB, including at Jones Hill Wood.
    HS2-tree-felling-Wendover-018.jpg
  • Wendover, UK. 9th April, 2021. A sign suggesting that HS2 and Thames Valley Police use ‘targeted violence’ against tree protectors is pictured outside Wendover Active Resistance Camp, which is occupied by activists opposed to the HS2 high-speed rail link. Tree felling work for the project is now taking place at several locations between Great Missenden and Wendover in the Chilterns AONB, including opposite the camp.
    HS2-tree-felling-Wendover-019.jpg
  • Wendover, UK. 9th April, 2021. HS2 security guards stand behind a fence around trees lining the A413 during tree felling operations for the HS2 high-speed rail link. Tree felling work for the project is now taking place at several locations between Great Missenden and Wendover in the Chilterns AONB, including at Jones Hill Wood.
    HS2-tree-felling-Wendover-020.jpg
  • Wendover, UK. 9th April, 2021. A sign reads ‘Bailiffs Are Not Essential Workers’ outside Wendover Active Resistance Camp, which is occupied by activists opposed to the HS2 high-speed rail link. Tree felling work for the project is now taking place at several locations between Great Missenden and Wendover in the Chilterns AONB, including at Jones Hill Wood.
    HS2-tree-felling-Wendover-021.jpg
  • Wendover, UK. 9th April, 2021. A Stop HS2 banner hangs from the exterior of Wendover Active Resistance Camp, which is occupied by activists opposed to the HS2 high-speed rail link. Tree felling work for the project is now taking place at several locations between Great Missenden and Wendover in the Chilterns AONB, including opposite the camp.
    HS2-tree-felling-Wendover-022.jpg