• Facebook
  • Twitter
x

MARK KERRISON | Photojournalist

  • Live News Feed
  • Slideshows
  • About
    • About
    • Data Protection
    • Terms and Conditions
  • Contact
Show Navigation
Archive
Cart Lightbox Client Area
Add to Cart Download
twitterlinkedinfacebook

2020-01-10 Stop HS2 Wendover Active Resistance Camp

22 images Created 10 Jan 2020

Wendover, UK. 10 January, 2020. Stop HS2 activists sit around a camp fire at the newly-established Wendover Active Resistance Camp. Activists from around the UK established the camp in woodland outside Wendover on the proposed route for HS2 through the Chilterns AONB in response to requests for assistance from members of the local community opposed to the high speed rail link. The impact on the immediate area is expected to be even worse than initially expected, with not only two 500m viaducts and a 1km embankment to be constructed but also a Bentonite factory and 240-bed accommodation block.
View: 100 | All

Loading ()...

  • Wendover, UK. 10 January, 2020. Stop HS2 activists sit around a camp fire at the newly-established Wendover Active Resistance Camp. Activists from around the UK established the camp in woodland outside Wendover on the proposed route for HS2 through the Chilterns AONB in response to requests for assistance from members of the local community opposed to the high speed rail link. The impact on the immediate area is expected to be even worse than initially expected, with not only two 500m viaducts and a 1km embankment to be constructed but also a Bentonite factory and 240-bed accommodation block.
    Stop-HS2-Wendover-camp-001.jpg
  • Wendover, UK. 10 January, 2020. A sign and notice outside the newly-established Wendover Active Resistance Camp. Stop HS2 activists from around the UK established the camp in woodland outside Wendover on the proposed route for HS2 through the Chilterns AONB in response to requests for assistance from members of the local community opposed to the high speed rail link. The impact on the immediate area is expected to be even worse than initially expected, with not only two 500m viaducts and a 1km embankment to be constructed but also a Bentonite factory and 240-bed accommodation block.
    Stop-HS2-Wendover-camp-002.jpg
  • Wendover, UK. 10 January, 2020. A sign outside the newly-established Wendover Active Resistance Camp alongside the A413. Stop HS2 activists from around the UK established the camp in woodland outside Wendover on the proposed route for HS2 through the Chilterns AONB in response to requests for assistance from members of the local community opposed to the high speed rail link. The impact on the immediate area is expected to be even worse than initially expected, with not only two 500m viaducts and a 1km embankment to be constructed but also a Bentonite factory and 240-bed accommodation block.
    Stop-HS2-Wendover-camp-003.jpg
  • Wendover, UK. 10 January, 2020. Stop HS2 activists sit around a camp fire at the newly-established Wendover Active Resistance Camp. Activists from around the UK established the camp in woodland outside Wendover on the proposed route for HS2 through the Chilterns AONB in response to requests for assistance from members of the local community opposed to the high speed rail link. The impact on the immediate area is expected to be even worse than initially expected, with not only two 500m viaducts and a 1km embankment to be constructed but also a Bentonite factory and 240-bed accommodation block.
    Stop-HS2-Wendover-camp-004.jpg
  • Wendover, UK. 10 January, 2020. A sign in the newly-established Wendover Active Resistance Camp. Stop HS2 activists from around the UK established the camp in woodland outside Wendover on the proposed route for HS2 through the Chilterns AONB in response to requests for assistance from members of the local community opposed to the high speed rail link. The impact on the immediate area is expected to be even worse than initially expected, with not only two 500m viaducts and a 1km embankment to be constructed but also a Bentonite factory and 240-bed accommodation block.
    Stop-HS2-Wendover-camp-005.jpg
  • Wendover, UK. 10 January, 2020. Stop HS2 activists sit around a camp fire at the newly-established Wendover Active Resistance Camp. Activists from around the UK established the camp in woodland outside Wendover on the proposed route for HS2 through the Chilterns AONB in response to requests for assistance from members of the local community opposed to the high speed rail link. The impact on the immediate area is expected to be even worse than initially expected, with not only two 500m viaducts and a 1km embankment to be constructed but also a Bentonite factory and 240-bed accommodation block.
    Stop-HS2-Wendover-camp-006.jpg
  • Wendover, UK. 10 January, 2020. Signs outside the newly-established Wendover Active Resistance Camp. Stop HS2 activists from around the UK established the camp in woodland outside Wendover on the proposed route for HS2 through the Chilterns AONB in response to requests for assistance from members of the local community opposed to the high speed rail link. The impact on the immediate area is expected to be even worse than initially expected, with not only two 500m viaducts and a 1km embankment to be constructed but also a Bentonite factory and 240-bed accommodation block.
    Stop-HS2-Wendover-camp-007.jpg
  • Wendover, UK. 10 January, 2020. Stop HS2 activists sit around a camp fire at the newly-established Wendover Active Resistance Camp. Activists from around the UK established the camp in woodland outside Wendover on the proposed route for HS2 through the Chilterns AONB in response to requests for assistance from members of the local community opposed to the high speed rail link. The impact on the immediate area is expected to be even worse than initially expected, with not only two 500m viaducts and a 1km embankment to be constructed but also a Bentonite factory and 240-bed accommodation block.
    Stop-HS2-Wendover-camp-008.jpg
  • Wendover, UK. 10 January, 2020. Part of the newly-established Wendover Active Resistance Camp. Stop HS2 activists from around the UK established the camp in woodland outside Wendover on the proposed route for HS2 through the Chilterns AONB in response to requests for assistance from members of the local community opposed to the high speed rail link. The impact on the immediate area is expected to be even worse than initially expected, with not only two 500m viaducts and a 1km embankment to be constructed but also a Bentonite factory and 240-bed accommodation block.
    Stop-HS2-Wendover-camp-009.jpg
  • Wendover, UK. 10 January, 2020. Stop HS2 activists sit around a camp fire at the newly-established Wendover Active Resistance Camp. Activists from around the UK established the camp in woodland outside Wendover on the proposed route for HS2 through the Chilterns AONB in response to requests for assistance from members of the local community opposed to the high speed rail link. The impact on the immediate area is expected to be even worse than initially expected, with not only two 500m viaducts and a 1km embankment to be constructed but also a Bentonite factory and 240-bed accommodation block.
    Stop-HS2-Wendover-camp-010.jpg
  • Wendover, UK. 10 January, 2020. Signs outside the newly-established Wendover Active Resistance Camp. Stop HS2 activists from around the UK established the camp in woodland outside Wendover on the proposed route for HS2 through the Chilterns AONB in response to requests for assistance from members of the local community opposed to the high speed rail link. The impact on the immediate area is expected to be even worse than initially expected, with not only two 500m viaducts and a 1km embankment to be constructed but also a Bentonite factory and 240-bed accommodation block.
    Stop-HS2-Wendover-camp-011.jpg
  • Wendover, UK. 10 January, 2020. A newspaper cutting hangs in the Wendover Active Resistance Camp. Stop HS2 activists from around the UK established the camp in woodland outside Wendover on the proposed route for HS2 through the Chilterns AONB in response to requests for assistance from members of the local community opposed to the high speed rail link. The impact on the immediate area is expected to be even worse than initially expected, with not only two 500m viaducts and a 1km embankment to be constructed but also a Bentonite factory and 240-bed accommodation block.
    Stop-HS2-Wendover-camp-012.jpg
  • Wendover, UK. 10 January, 2020. Stop HS2 activists sit around a camp fire at the newly-established Wendover Active Resistance Camp. Activists from around the UK established the camp in woodland outside Wendover on the proposed route for HS2 through the Chilterns AONB in response to requests for assistance from members of the local community opposed to the high speed rail link. The impact on the immediate area is expected to be even worse than initially expected, with not only two 500m viaducts and a 1km embankment to be constructed but also a Bentonite factory and 240-bed accommodation block.
    Stop-HS2-Wendover-camp-013.jpg
  • Wendover, UK. 10 January, 2020. A sign outside the newly-established Wendover Active Resistance Camp. Stop HS2 activists from around the UK established the camp in woodland outside Wendover on the proposed route for HS2 through the Chilterns AONB in response to requests for assistance from members of the local community opposed to the high speed rail link. The impact on the immediate area is expected to be even worse than initially expected, with not only two 500m viaducts and a 1km embankment to be constructed but also a Bentonite factory and 240-bed accommodation block.
    Stop-HS2-Wendover-camp-014.jpg
  • Wendover, UK. 10 January, 2020. Part of the newly-established Wendover Active Resistance Camp. Stop HS2 activists from around the UK established the camp in woodland outside Wendover on the proposed route for HS2 through the Chilterns AONB in response to requests for assistance from members of the local community opposed to the high speed rail link. The impact on the immediate area is expected to be even worse than initially expected, with not only two 500m viaducts and a 1km embankment to be constructed but also a Bentonite factory and 240-bed accommodation block.
    Stop-HS2-Wendover-camp-015.jpg
  • Wendover, UK. 10 January, 2020. Stop HS2 activists sit around a camp fire at the newly-established Wendover Active Resistance Camp. Activists from around the UK established the camp in woodland outside Wendover on the proposed route for HS2 through the Chilterns AONB in response to requests for assistance from members of the local community opposed to the high speed rail link. The impact on the immediate area is expected to be even worse than initially expected, with not only two 500m viaducts and a 1km embankment to be constructed but also a Bentonite factory and 240-bed accommodation block.
    Stop-HS2-Wendover-camp-016.jpg
  • Wendover, UK. 10 January, 2020. Part of the newly-established Wendover Active Resistance Camp. Stop HS2 activists from around the UK established the camp in woodland outside Wendover on the proposed route for HS2 through the Chilterns AONB in response to requests for assistance from members of the local community opposed to the high speed rail link. The impact on the immediate area is expected to be even worse than initially expected, with not only two 500m viaducts and a 1km embankment to be constructed but also a Bentonite factory and 240-bed accommodation block.
    Stop-HS2-Wendover-camp-017.jpg
  • Wendover, UK. 10 January, 2020. A pot of soup is prepared in the Wendover Active Resistance Camp. Stop HS2 activists from around the UK established the camp in woodland outside Wendover on the proposed route for HS2 through the Chilterns AONB in response to requests for assistance from members of the local community opposed to the high speed rail link. The impact on the immediate area is expected to be even worse than initially expected, with not only two 500m viaducts and a 1km embankment to be constructed but also a Bentonite factory and 240-bed accommodation block.
    Stop-HS2-Wendover-camp-018.jpg
  • Wendover, UK. 10 January, 2020. Stop HS2 activists sit around a camp fire at the newly-established Wendover Active Resistance Camp. Activists from around the UK established the camp in woodland outside Wendover on the proposed route for HS2 through the Chilterns AONB in response to requests for assistance from members of the local community opposed to the high speed rail link. The impact on the immediate area is expected to be even worse than initially expected, with not only two 500m viaducts and a 1km embankment to be constructed but also a Bentonite factory and 240-bed accommodation block.
    Stop-HS2-Wendover-camp-019.jpg
  • Wendover, UK. 10 January, 2020. Part of the newly-established Wendover Active Resistance Camp. Stop HS2 activists from around the UK established the camp in woodland outside Wendover on the proposed route for HS2 through the Chilterns AONB in response to requests for assistance from members of the local community opposed to the high speed rail link. The impact on the immediate area is expected to be even worse than initially expected, with not only two 500m viaducts and a 1km embankment to be constructed but also a Bentonite factory and 240-bed accommodation block.
    Stop-HS2-Wendover-camp-020.jpg
  • Wendover, UK. 10 January, 2020. Part of the newly-established Wendover Active Resistance Camp. Stop HS2 activists from around the UK established the camp in woodland outside Wendover on the proposed route for HS2 through the Chilterns AONB in response to requests for assistance from members of the local community opposed to the high speed rail link. The impact on the immediate area is expected to be even worse than initially expected, with not only two 500m viaducts and a 1km embankment to be constructed but also a Bentonite factory and 240-bed accommodation block.
    Stop-HS2-Wendover-camp-021.jpg
  • Wendover, UK. 10 January, 2020. Stop HS2 activists sit around a camp fire at the newly-established Wendover Active Resistance Camp. Activists from around the UK established the camp in woodland outside Wendover on the proposed route for HS2 through the Chilterns AONB in response to requests for assistance from members of the local community opposed to the high speed rail link. The impact on the immediate area is expected to be even worse than initially expected, with not only two 500m viaducts and a 1km embankment to be constructed but also a Bentonite factory and 240-bed accommodation block.
    Stop-HS2-Wendover-camp-022.jpg